My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-21-2005 Planning Commission Packet
Orono
>
Planning Commission
>
2005
>
11-21-2005 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2012 4:11:25 PM
Creation date
4/4/2012 4:11:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
^ #OS-3161 <br /> � November 16,2005 <br /> Page 5 of 6 <br /> �. ParkJTrail Easement or Dedication Needed <br /> The CMP indicates a firture trail along North Shore Drive and Shadywood Road. The <br /> CMP has not indicated which side of the road the tr�ils are plaiu-ied for but it does <br /> indicate the trail would be on the shoulder o2� separated. The Park Commission will be <br /> asked to review and conunent on the proposed plat with relation to required park <br /> dedication and whether cash anci/or land dedication will be required. The park dedication <br /> fee would be as follows: <br /> 8% of the fair market value of the land with a minimum of$3,250 and a cap of$5550 per <br /> lot (excluding the number of homes existing or e�isted): <br /> 2 Lots x$S,SSO = �11,100.00 <br /> Road Improvements and/or Easements Needed <br /> It is not anticipated that any improvements to North Shore Drive or Shadywood Road <br /> would be required and no new accesses are proposed. Two private access outlots will be <br /> platted, with Outlot A providing access for Lots 1 and 3 and Outlot B providing access <br /> for Lots 4 and 5. Staff is somewhat concerned with the driveway orientation of the <br /> driveway proposed to serve Lot 4. The concerns arise by the extensive ainount of <br /> retairung wall necessary and the proximity of that retaining wall and driveway to the lot <br /> to the west. The back lot stanclards listed in Section 78-1370 (3) (c) require a minimlm� <br /> of a 10' dt•iveway setback when abutting a side or rear lot line of an adjacent lot. The <br /> applicant should revise the driveway within Outlot B to meet a 10' setback, and also <br /> address the City Engineer recommendations on this issue noted in Exhibit O (first bullet). <br /> Secondly, Hennepin County has reviewed the proposed plat and provided comments to <br /> the owner. Those comments are attached as Exhibit P, whereby the County is requesting <br /> that the City require dedication of an additional 7' of right-of-way along North Shore <br /> Drive (CSAH 19) for a firture right turn lane onto Shadywood Road (Co. Rd. 51). It has <br /> been the City of Orono's practice to not require these dedications as the property owner <br /> could be compensated for the dedication at the time the improvement is planned. The <br /> Plamiing Conunission may want to determine whether an additional 7' should be <br /> dedicated and how that impacts the proposed plat with respect to required setbacks and <br /> lot areas. <br /> Lastly, the City will require standard 10' drainage and utility easements along all <br /> periphery property boundaries and 5' drainage and utility easements along all interior <br /> property boundaries, as well as conservation and flowage easements over the delineated <br /> wetland on Lot 4. <br /> Stormwater and Drainage Improvements <br /> The applicants have not provided aily water quality or rate control, wluch the City <br /> Engineer has determined will be rec�uired. <br /> The property will also be subject to the Stormwater ancl Drainage Trunlc Fee, established <br /> by the 2005 fee schedule 1s $4,160 per acre for the '/2 acre zone. The total acreage is 3.85 <br /> aci�es. Payment of the Stormwater aud Drainage Tilililc I'ee consists as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.