My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-21-2005 Planning Commission Packet
Orono
>
Planning Commission
>
2005
>
11-21-2005 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2012 4:11:25 PM
Creation date
4/4/2012 4:11:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�Bonestroo <br /> 0 Rosene <br /> e m o �Anderlik& <br /> Associates <br /> Englneers 6 Architec[s <br /> Project Name: Mackinnon Hill Client: City of Orono <br /> To: Mike Gaffron, Planning Director File No: 139-05-000 <br /> From: John Smyth, Senior Scientist Date: 11/17/05 <br /> Re: Wetland Review <br /> Remarks: <br /> Site Summary <br /> The development was reviewed for wetland impacts. Currently a wetland is located within the southern portion <br /> of the site. A small creek flows into the wetlands under Watertown Road via a culvert. The creek flows through <br /> the northwest side of the wetland. There is a drainage easement shown on the plan however the easement <br /> location on the southern portion of the property does not reflect the location of the creek and in one location is <br /> shown on a slope. I would recommend that the centerline of the creek be surveyed and the drainage easement <br /> be modified to more accurately reflect the drainage through the site and also assist in the pond location as <br /> discussed in the paragraph below. <br /> Proposed Wetland Impacts and Ponding <br /> The impacts to the wetland are from a proposed treatment pond. It is my understanding the goal of locating this <br /> pond within the wetland was to preserve the wooded area within the site. I have reviewed the pond location <br /> with our Water Resource Engineer and here are some items to be considered to further preserve trees on this <br /> site. <br /> 1) Shift pond slightly to southwest to further avoid trees and potentially the creek. <br /> 2) Currently a pipe from catch basin 2 and 3 cut across the wooded area to a manhole and then the treatment <br /> pond. It is recommended that these catch basins be routed along the proposed road to catch basin 7 so <br /> only one pipe crosses the wooded area. Realignment of a pipe from catch basin 7 to the pond could also <br /> reduce impacts to the wooded area and could be aligned to discharge at the upstream portion of the pond <br /> to provide better treatment. <br /> 3) Consideration will need to be made in the pond design and location to insure that the creek does not flow <br /> into the pond and reduce its treatment efficiency by flushing it with clean water. <br /> Bonestroo, Rosene,Anderlik and Associates, Inc. www.bonestroo.com <br /> ❑St.Paul Office: O Milwaukee Office: O Rochester Office: ❑Willmar Office: O St.Cloud Office: O Grayslake Office: <br /> 2335 West Highway 36 1516 West Mequon Road 112 7`h Street NE 205 5th Street SW 3721 23r°Street S 888 East Belvidere Road <br /> St.Paul.MN 55113 Mequon,WI 53092 Rochester,MN 55906 Willmar,MN 56201 5t.Cloud,MN 56301 Grayslake,IL 60030 <br /> Phone:651-636-4600 Phone:262-241-4466 Phone:507-282-2100 Phone:320-214-9557 Phone:320-251-4553 Phone:847-548-6774 <br /> Fax:651-636-1311 Fax:262-241-4901 Fax:507-282-3100 Fax:320-214-9458 Fax:32�-251-6252 Fax:847-548-6979 <br />
The URL can be used to link to this page
Your browser does not support the video tag.