Laserfiche WebLink
SUMMIT FIRE PROTECTION <br /> 575 MINNEHAHAAVE.W•ST.PAUL,MN 55103•(651)251-1880 3026 40TH AVE.NW•ROCHESTER,MN 55901 •(507)280-0622 <br /> 4�GREOT OAK DR.,WAITE PARK,MN 56387•(320)257-6390 760 LIBERTY WAY,NORTH LIBERTY,IA 52317•(319)665-4330 <br /> 4208 ENTERPRISE CIRCLE•DULUTH,MN 55811 •(218)740-4412 <br /> SHEET 2 OF 2-Use separate sheet for eachsystem inspection Type of System ' <br /> Inspection Name and Number How Many? ����� <br /> What Size? <br /> Flow Switch or <br /> Alarm Check with Pressure Switch <br /> 9. Date dry-pipe valve trip tested (control valve partially open) (See Trip Test Table which follows) <br /> 10. Date dry-pipe valve trip tested (control va(ve fully open) (See Trip Test Table whicn follows) <br /> 11. Date quick-opening device tested (See Trip Test Table which follows) <br /> DRY VALVE TRIP TEST TABLE o.o.�. <br /> MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. <br /> DRY PIPE Time to Trip Water Air Trip Point Time Water Reached Alarm Operated <br /> OPERATING Thru Test Pipe Pressure pressure Air Pressure Test Outlet Properly <br /> TEST MIN. SEC. PSI PSI PSI MfN. SEC. YES NO <br /> Without . �- ' <br /> Q.O.D. J <br /> With <br /> Q.O.D. <br /> 12. Date deluge or preaction valve tested (See T'rip Test Table which fo/lows) <br /> TRIP TEST TABLE <br /> Operation ❑ PNEUMATIC ❑ ELECTRIC � HYDRAULIC <br /> Piping Supervised ❑ YES ❑ NO Detecting media supervised ❑ VES ❑ NO <br /> DELUGE& Does valve operate from the manual trip and/or remote control stations ❑ YES ❑ NO <br /> PREACTION Is there an accessible facility in each circuit for testing Method ot testing-circuits <br /> VALVES ❑ YES ❑ NO <br /> Does each circuit operate Does each circuit Maximum time to <br /> MAKE MODEL su rvision loss alarm o erate valve release o erate release <br /> YES NO YES NO YES NO <br /> 13. See Control Valve Maintenance Table. <br /> Control Va1ve Maintenance Table <br /> Explain <br /> Abnormai <br /> Control Vaives Number Type OQen Secured Closed Signs Condition <br /> City Connection Control — � <br /> Valve , _.._ <br /> Tank Control Vaives <br /> Pump Conhol Valves <br /> Sectionai Control Valves <br /> System Control Valves f - <br /> Other Control Valves <br /> Kitchen Control Valve <br /> 16. Water Flow Test at Sprinkler Riser <br /> Water Supply Source: City , Tank Pump <br /> Date Test Pipe Size of Static Residual Differential <br /> Location Test Pipe Pressure (Flow) <br /> Pressure <br /> ��'�----�ast�Water Flow Test <br /> This WaCer Flow Test � <br /> 14. Explain any"No"answers and comments: <br />�f� <br /> Signature: I Date: <br /> �^-,v~� ''�"k�--T''-ri�'T+--�j` <br /> d <br /> ,�i <br />