My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-18-2005 Planning Commission Packet
Orono
>
Planning Commission
>
2005
>
07-18-2005 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2012 12:16:29 PM
Creation date
4/4/2012 12:16:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: 2/23/OS � <br /> � Date Application Considered as Complete: 2/23/05 ' <br /> 60-Day Review Period Expires: (DELAYED DUE TO WETLAND MORATORIUM) <br /> TO: Chair Ralui and Orono Planning Conunission <br /> Ron Moorse, City Aciministrator <br /> FROM: Mike Gaffron, Plaruung Director � ��� <br /> � <br /> DATE: July 14, 2005 <br /> SUBJECT: #OS 3095 - Gregg Steinhafel, 2265 North Shore Drive <br /> - Conditional Use Permit to Install Permanent Dock <br /> - Variance for Structure within a Wetland- Public Hearing <br /> Zoning District: LR-lA, Single Family Lakeshore Residential, 2-acre <br /> Lot Area: 29 acres <br /> Application Sacmmc�ry: Applicant requests a CUP to allow construction of a pernlanent piling <br /> dock in the bed of Lake Minnetonka. This requires a Conditional Use Permit under the Flood <br /> Plain Ordinance, and because the dock will be extending through a lake perimeter wetland, <br /> review has been suspended since March because of the wetland moratorium. Under the <br /> proposed (but not yet adopted)new wetland ordinance, docks not exceeding 4' in width <br /> providing"reasonable access to the lakeshore"would be a permitted wetland use, not <br /> requiring special approvals. <br /> Staff Recommendation: Staff recoirunends that the application be reviewed to detei7nine <br /> whether there are any potential negative impacts associated with the dock, and tabled pending <br /> coinpletion of the wetland inoratoriuni and/or adoption of a new wetland ordinance. <br /> List of Eahibits <br /> A-Application <br /> B - Plat Map <br /> C - LMCD Permit Application <br /> D - Proposed Dock Location Survey <br /> E-Propet-ty Owners List <br /> F -Airphoto <br /> G - Correspondence <br /> H - Draft Wetland Ordinance <br />
The URL can be used to link to this page
Your browser does not support the video tag.