My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-18-2005 Planning Commission Packet
Orono
>
Planning Commission
>
2005
>
01-18-2005 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2012 12:05:50 PM
Creation date
3/14/2012 12:05:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#04-2987 <br /> � March 15,2004 <br /> ' Page 3 of 7 <br /> Lot 2— This lot is shown as 2.914 acres of dry and 27.76 total acres. This lot will gain <br /> access off the cul-de-sac portion of the private road. This lot as currently <br /> oriented creates soine design challenges as a small portion of buildable area <br /> exists at the street end as well as the 929.4' end, however are not contiguous <br /> when the 100' lake setback far structures is taken into consideration. Access to <br /> the proposed hoine location will require a driveway to hug the lot line to meet <br /> the 75' hardcover restriction. Septic I�ispector, Matt Bolterman has also <br /> determined that the proposed sites do not meet the required 20' setback to the <br /> home. Construction of a home in tlus lot meeting all setback, hardcover, aud <br /> septic restrictions will be difficult. The ideal layout would be combination of <br /> proposed lot 2 and lot 3. <br /> Lot 3 — The lot is shown as 2.04 acres of dry and 5.40 acres total. Tlus lot will also <br /> front the proposed private roadway at the cul-de-sac and have approximately <br /> 380' of frontage at the 929.4' elevation. This lot appears very buildable <br /> assuming the amount of dry acreage is correct and the formal septic reports are <br /> favorable. <br /> Lot 4— This lot is shown at 2.86 acres of dry and 2.98 acres total. The lot will have <br /> approximately 600 feet of frontage of the proposed private road with only a few <br /> feet of frontage at the 929.4' elevation. The Subdivision Ordinance would <br /> require that the driveway access extend off the straight section of the private <br /> road and not the cul-de-sac portion. The topography appears challenging, <br /> however the lot appears buildable with respect to setback, septic and hardcover . <br /> standards. <br /> Lot 5 — This lot is shown at 2.13 acres dry and 2.30 acres total. This lot would not have <br /> any frontage at the 929.4' elevation and would be considered a corner, non- <br /> lakeshore lot. Access would be required from the southerly end of the proposed <br /> private road frontage. This lot appears very buildable as currently laid out. <br /> Staff's only concern with this lot is the existing access along the southerly lot <br /> line to the existing house further east. Should the applicants wish to keep the <br /> existing drive access to the existing house, a private easement must be pursued. <br /> The other option is to require that it be placed in an outlot. With either the <br /> easeinent option or the outlot option, the area devoted to the driveway access <br /> cannot be counted towards the 2.0 acre area requirement under the Subdivision <br /> Ordinance definition of `lot area'. With the existing access, therefore, the lot <br /> would not meet the minimum standard for area. <br /> Lot 6— The lot is shown as approximately 5.17 acres of dry and 7.60 acres total. The <br /> existing house is proposed to reinain as well as the gliest l�ouse. Wetlands exist <br /> to the northeast with a setback of 26' shown. A�proximately 400 feet of <br /> frontage at the 929.4' elevation is shown with all stnicture setbacks far the <br /> existing house easily rnet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.