My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-18-2005 Planning Commission Packet
Orono
>
Planning Commission
>
2005
>
01-18-2005 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2012 12:05:50 PM
Creation date
3/14/2012 12:05:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#OS-3080 <br /> January 18,2005 <br /> ' Page 7 of 10 <br /> I�� order to meet parking lot a�id driving lane grade limits, and to acconunodate the <br /> proposed walkotitts, the site will be undergoing fairly substantial overall grade reductions. <br /> The high ground in the south half of the property will be lowered approximately 4'-8' on <br /> average, while the walkout corridor along the north and east lot lines result in cuts <br /> averaging 10'-15' or more. <br /> The parking area north of the welding shop building will be elevated about 8' above the <br /> adj acent welding shop site, requiring an east-west 6' retaining wall. This wall will <br /> continue north and south along the westerly boundaries of the site. Applicants should <br /> provide a detailed description of how these walls will be designed so that their visual <br /> impacts as viewed froni off-site can be assessed. <br /> Utilities/Easement Vacations <br /> The property has municipal sewer and water available, which was installed <br /> approxiinately 15 years ago. No sewer or water assessments will be due for the proposed <br /> office uses, as the property has previously been fiilly assessed. Additional cotiiments <br /> regarding the utility plan can be found in attached Exhibit O. <br /> The portions of utility/drainage easements that likely need to be vacated were granted as <br /> part of the site plan approval for the office building under prior approvals, and will <br /> conflict with the current site plan in certain areas. Those easements contain no utilities at <br /> this point, and staff reconunends approval for their vacation subject to appropriate <br /> replacement easements being granted. <br /> Road and Pedestrian Access <br /> ExteYio�°Site Access <br /> Access to the site was established during the approval process for PUD No. 2, and <br /> coiisists of a shared right-in/right-out driveway access directly to Highway 12, and a <br /> shared driveway access eastward tllrough the Orono Woods site to Brown Road North. <br /> Future access potential to the west exists at the northwest corner of the site where it abuts <br /> Outlot D, Sugarwoods. Outlot D was platted as a potential service road corridor behind <br /> the Orono Shopping Center and Service 800 buildings, with possible connections <br /> southward to 12/Brimhall, or west through the Otten Brothers property to Willow Drive. <br /> At this time the City has no plazls to develop Outlot D for this use, but it remains <br /> available for firture use. The applicants are proposing a connectioil to Outlot D. <br /> Existing Highway 12 will Ue tunied over to Hemlepin County when Highway 12 is <br /> relocated. Brown Road south of 12 will be realigned to create an intersection with <br /> existing 12 directly across from Brown Road North and a semaphore is intended for <br /> installation at that intersection. The schedule for installation of that stoplight is still being <br /> discussed with MnDOT, but it niay be delayed until the realignment of South Brown is <br /> coinpleted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.