My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2521
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 2500 - 2599 September 12, 1988 - March 13, 1989)
>
Resolution 2521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2016 2:10:59 PM
Creation date
6/29/2016 2:10:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />• <br />• <br />City of OR ONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. 2521 <br />B) The City Council of the City of Orono, pursuant to -the foregoing <br />findings and in accordance with Minnesota Statutes Sections 463.15 to <br />463.261 hereby orders the owner(s) of the property to make the <br />following repairs in order to correct the hazardous condition: <br />Interior Basement <br />1. Install a new floor over the exiting dirt floor. <br />2. Remove and replace foundation walls. <br />3. Remove and replace undersized beams. <br />4. Install proper supports. <br />5. Provide and install rim joist insulation. <br />6. Remove and replace. broken windows. Repair <br />necessary. <br />7. Provide new cellar door. <br />Basement Stairs <br />1. Remove and replace treads/risers. <br />2. Install handrails. <br />Electrical <br />1. Service Panel: remove and replace. <br />2. Provide 100 amp service panel. <br />3. Remove and replace greenfield wiring. <br />4. Remove and replace receptacles. <br />Plumbing <br />1. Seal up waste pipe. <br />2. Remove and set furnace closer to chimney. <br />3. Install a T & P relief valve. <br />the windows if <br />Heating Svstem <br />1. Move furnace closer to chimney and remove combustibles. <br />2. Remove and replace main trunk and branch duct pipe. <br />Rear/Side Entry <br />1. Remove and replace floor. <br />2. Clean and remove and replace walls as needed. <br />Kitchen <br />1. Clean and replace floor as needed. <br />•2. Clean and replace walls as needed. <br />3. Repair roof to control humidity, scrape paint and re -paint <br />ceiling. <br />4. Remove and replace windows. <br />5. Exterior door needs paint to preserve wood. <br />6. Countertops and cabinets need to be removed and replaced. <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.