Laserfiche WebLink
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> MONDAY, APRIL 19, 2004 <br /> - 6:00 o'clock p.m. <br /> (7. #04-3001 STEVEN AND MARCIA TIFFANY, 1325 REST POINT LANE, VARIANCE— <br /> Continued) <br /> alley right-of-way in order to build a new single family residence on a lot 15,425 s.f. (0.35 acre) <br /> in area where 43,560 s.f. (1 acre) is required, 75' in width where 100' is required and side yard <br /> setback of 20' from the alley where 35' is required, stipulating that there will no other changes <br /> to the residence footprint (with a 36'diameter) when allowed to more flexibly locate the <br /> building between the side yard setbacks. <br /> In discussion, Chair Mabusth asked if a limitation on the footprint is needed, asking the applicant if <br /> they understood there could be not change in the residence footprint, even while allowing it to be <br /> more centrally located. <br /> Mr. Tiffany indicated there would be no changes to the footprint. <br /> VOTE: Ayes 7, Nays 0. <br /> 8. #04-3002 G & L LAND INVESTMENT, LLC, 740 NORTH ARM DRIVE,VARIANCE, <br /> PUBLIC HEARING (9:35-10:15 p.m.) <br /> Gundlach explained the application is for a variance to allow an existing non-confirming 2-level <br /> accessory structure, known as a boathouse and located at 10' from the 929.4 elevation, to remain on <br /> the lot in conjunction with a rebuild of the principal structure. Structures within the 0-75' zone are <br /> not permitted under the Zoning Ordinance nor does the boathouse, acting as structure and hardcover <br /> within the 0-75' zone,meet requirements set forth in the Zoning Code. <br /> In the City's view, Gundlach advised the lot is being rebuilt and is therefore subject to all standards <br /> within the Zoning Ordinance. This requires removal of the non-conforming boathouse that <br /> contributes to excess structure and hardcover with the 0-75' zone. Applicants are proposing to meet <br /> all other standards of the Zoning Code, including structural coverage and hardcover. She explained <br /> the applicants have contributed the hardcover associated with the boathouse to the 75'-250' zone and <br /> meets the 25%hardcover for that zone. <br /> Gundlach stated that during rebuilds staff has consistently recommended these structures be removed, <br /> as it is the only opportunity to eliminate a non-conformity. She recommended the Planning <br /> Commission discuss the hardships presented by the applicant consisting of topography and damage to <br /> the sewer line. <br /> Gundlach referred the Planning Commission to her written staff report in which she addressed the <br /> applicant's hardship claims. She summarized that she did not find that the applicants have any valid <br /> hardships and recommended denial of the requested variance to allow the boathouse to remain. <br /> Further, Gundlach suggested the Planning Commission should indicate if the easement along the <br /> shore should be pursued at this time of ownership transition and in conjunction with a building permit <br /> to construct a new home. She confirmed the Public Works department does need to get down to the <br /> manhole and sewer line that runs along the shore past the boathouse. <br /> Page 34 of 49 <br />