My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/19/2004 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2000-2009
>
2004
>
04/19/2004 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2012 10:58:29 AM
Creation date
3/9/2012 10:58:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4` MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> MONDAY, APRIL 19, 2004 <br /> 6:00 o'clock p.m. <br /> (2. #04-2974 RELIANCE DEVELOPMENT COMPANY, LLP, "STONEBAY <br /> MARKETPLACE," NW QUADRANT HWY 12/WILLOW DRIVE, COMMERCIAL PUD <br /> DEVELOPMENT—Continued) <br /> Gaffron stated the current plan includes three buildings, one for a 14,820 s.f. Walgreens and two <br /> other retail buildings at 8,970 s.f. and 4,960 s.f. with a total of 28,750 s.f. on a site of 3.69 acres, or <br /> 17.9% of the site. Green space is 26%, excluding trails, which met the city's 25% goal. <br /> Gaffron reported the building orientations have been revised per Plan#25 to create a friendlier <br /> entrance from Kelley Parkway, the site's primary access, with a right in/right out entrance at Willow <br /> and no access onto Hwy 12. The primary facades and parking areas are not aimed at the residential <br /> portion of Stonebay in keeping with the Stonebay developer's request. Gaffron stated the site <br /> circulation plan vastly improved providing adequate building separation from the intersection to <br /> maintain an open feel while providing substantial green islands within the parking area, concluding <br /> the circulation works very well. <br /> Gaffron pointed out one of the goals of the Comprehensive Plan Amendment and March 1, 2004 <br /> letter from Orono to the developer is met with the westerly building now oriented to take advantage <br /> of the stormwater pond as an amenity. The applicant is now proposing landscaped public terracing <br /> near Kelley Parkway overlooking the pond though it is within Outlot B, dedicated by MnDOT for <br /> stormwater pond use. He indicated MnDOT would need to confirm if there is any problem with the <br /> terrace being located within Outlot B. <br /> One setback variance is needed for Revised Plan#25, which is a 20' setback (35' is standard) to the <br /> westerly lot line. Gaffron advised that staff supports the slight encroachment of the westerly building <br /> upon the westerly required setback, as the westerly lot line does not abut a road or an adjacent <br /> building site. <br /> Gaffron explained the site will have two 'drive-throughs' —one for Walgreens and one serving food- <br /> oriented type use in the westerly end unit of the middle building, illustrating these areas on the <br /> overhead map. <br /> Gaffron indicated the application generally conforms to the Council-approved language of the <br /> Comprehensive Plan amendment. <br /> Gaffron summarized the plan's conformity to several B-6/PUD standards: <br /> 1. Allowed Uses—proposed buildings and site layout would reasonably accommodate many <br /> of the individual uses on the proposed list of allowable uses. <br /> 2. Lot Area &Width—proposed preliminary plat creates two lots: Lot 1=1.98 acres/370', <br /> and Lot 2=1.71 acres/135'. Both lots are slightly undersized in area; however, the 3.69- <br /> acre site is limited and as no additional land is available, staff recommends approval of lot <br /> area and widths as proposed. <br /> 3. Setback— Setback requirements conform, noting required setbacks are based on the B-1 <br /> retail standards, which are more appropriate than the B-6 office standards for proposed <br /> retail uses. <br /> 4. Site Drainage—Drainage plan includes catch basins and storm sewers that will discharge <br /> into the adjacent Stonebay development regional pond. <br /> Page 2 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.