� 7. Swivel the mined by the �. - chamber and • � ''-^�`"
<br /> chamber on the preference of '� All-in-One ���' ';1 �' `
<br /> pin to achieve the installer or � "' �,.� Endcap to � � :-.� � t
<br /> the proper direc- N designer. � ; accommodate � � " �'��.:.- �
<br /> tion for trench s,� � �� 2. With a hole 4-inch SchedulF -r';`,,, ,
<br /> layout �� � j` saw, drill a ;'� �� 40 pipe. Drill "�:�'�" . ` "��,,,,
<br /> �����.
<br /> NOTE:The ` ' 4Y2-inch openinc; � - a 2'/z-inch
<br /> chamber allows on the end of �, � opening on the
<br /> up to 10-degree � �= the Quick4 Plus �.i>.,�,, ,�;,�,,�, S��,F �,t�,p_ Quick4 Plus
<br /> swivel in either � �� ��; !`� All-in-One 12 �,..:,. Standard
<br /> '•``�` :� �
<br /> direction at �•s��•r ���������r�� Endcap to cre- ��'�� chamber to z F,�E�� F„��a�, �„� � ��,,,,,�,.
<br /> each joint. ate an invert at �y� �'��� accommodate a
<br /> 8. Continue connecting chambers until the 0.5 inches. This ,--ac _ .,; �R 2-inch Schedule 40 pipe.
<br /> trench is completed. will allow efflu- �y�-� � �` r 2. Set a cut piece of pipe of the appropri-
<br /> NOTE:As chambers are installed, verify ent to fill both � ate length into the corresponding endcap's
<br /> they are level or have the prescribed slope. sides of the inspection port sleeve.
<br /> 9.The last � , chamber line. ��.�.-. � 3. Use two screws to fasten the pipe to
<br /> chamber in the ='�"'" `� ` 3. Snap off the "" � the sleeve around the inspection port.
<br /> trench requires ' - molded splash i _� 4.Attach a threaded cap or cleanout
<br /> an endcap. Lift .. � plate located on 2 �,r�u e��a�aF o�,�,.,��.' assembly onto the protruding pipe at the
<br /> the endcap at r �, the bottom front appropriate height.
<br /> 45-degree anglc . �' , of the endcap. 5.A small valve cover box may be used
<br /> and align the �` ' ` � � 4. Install splash plate into the appropriate if the inspection port is below the desired
<br /> ,,��'
<br /> connector hook slots below the inlet to prevent trench grade.
<br /> on the top of the , Y bottom erosion.
<br /> chamber with 9.F'i�ce e�,ac�P o�tiec e�d. 5. Place the back edge of the endcap over COVERING THE SYSTEM
<br /> the raised slot the inlet end of the first chamber. Be sure
<br /> on the top of the endcap. Lower the end- to line up the Before backfilling,the system must be
<br /> cap to the ground and into place. locking pins on � inspected by a health officer or other
<br /> NOTE: Place a few shovels of soil around the top of both ., official as required by State and local
<br /> chamber and . � -"` codes. Create an as-built drawing at
<br /> the endcap to secure it during backfill. , this time for future records.
<br /> endcap. , \
<br /> 10.To ensure structural stability, fill the �
<br /> 6. Insert ��`; `' � � 1. Backfill the trench by pushing fill
<br /> sidewall area by pulling soil from the �'i
<br /> connection pipe ` `� material over the chambers with a back-
<br /> sides of the trench with a shovel. Start at � ��` hoe. Kee a minimum of 12 inches of
<br /> the joints where the chambers connect. 2.5 inches into ( �"9�--. P
<br /> opening on �. _ compacted cover over the chambers
<br /> Continue backfilling the entire sidewall endca before driving over the system.
<br /> area, making sure the fill covers the lou- p'
<br /> vers. NOTE: Do not drive over system while
<br /> 11. Pack down fill by walking along the INSTALLING INSPECTION PORTS backfilling in sand.
<br /> NOTE: For shallow cover applications,
<br /> edges of trench and chambers. Inspection ports may be installed on each you must mound 12 inches of soil over
<br /> NOTE: In wet or clay soils, do not walk in of the chamber tops or on top of the the system before driving over it, and then
<br /> the sidewalls. G�uick4 Plus All-in-One 12 Endcap. grade it back to 6 inches upon completion.
<br /> 12. Proceed to the next trench and begin Endcap Inspection Port 2. It is best to mound several inches of
<br /> with Step 1. 1.With a hole saw drill the pre-marked soil over the finish grade to allow for
<br /> area in the top � - �' settling.This also ensures that runoff water
<br /> , ! ;�<.
<br /> INSTALLING QUICK4 PLUS of the chamber F,.�.-' ° is diverted away from the system.
<br /> ALL-IN-ONE 12 ENDCAPS AS A or endcap to � 3.After the system is covered, the site
<br /> create an open- � ` should be seeded or sodded to prevent
<br /> MID-LINE CONNECTION ing based on �r,; • ,: :�: � _ _ erosion.
<br /> 1. With a hole saw drill an opening appro- Pipe type. � NOTE• If the system is for new home
<br /> priate for the pipe diameter being used on NOTE: Drill a ' `�� •b construction, it is important to leave
<br /> the side(3.3" invert)or on top(9.0" invert) 4Yz-inch openin,_ 1 " ��, l marking stakes along the boundary of the
<br /> of endcap. on the Quick4 ,� A � '� �i system. This will show contractors where
<br /> NOTE: Piping configurations are deter- Plus High -" ,, . �s�. the site is located so they will not cross it
<br /> ,
<br /> Capacity .. � ��_-�,.������;, with equipment or vehicles.
<br /> � 4 Business Park Road Infiltrator Systems,Inc.Limited Warranty
<br /> � P.O.Box 768 Available at:www.infittrators stems.com
<br /> Old Saybrook,CT 06475 Y
<br /> I N F I LT R AT O R� 1-800 221 4436�860-577-7001 or call 1-800-221-4436
<br /> systems I�C. www.infiltratorsystems.com
<br /> U.S.Patents:4,759,661;5.017,041;5.156,488:5.336,017:5.401,116;5.401,459:5,511.903;5.716,163:5,588.778;5,839,844 Canadian Patents:7.329,959;2,004.564 Other patents pending.Infltrator,Equalizer,
<br /> Quick4,and SideWinder are registered trademarks of Infiltrator Systems Inc.Infltrator is a registered trademark in France.Infltrator Systems Inc.is a registered trademark in Mezico.Contour.MicroLeaching,
<br /> PolyTufl,ChamberSpacer.MultiPort.PosiLock,QuickCut,OuickPlay.SnapLock and St�aigMLock are trademarks of Infltrator Systems Inc.PolyLok is a trademark of PolyLok,Ina TUF-TITE is a registered
<br /> trademark of TUF-TITE.INC.Ultra-Rib is a trademark of IPEX Ina OO 2013 Infiltrator Systems Inc.All n9hts reserved.Printed in U.S.A. PLUS09 05131SI
<br /> • • � ' • . • : 11 •
<br />
|