Materials and Equipment Needed � �
<br /> ❑Quick4 Plus chambers ' I � � � � � ' I
<br /> ❑Quick4 Plus All-In-One 12 endcaps
<br /> ❑PVC pipe and couplings � � � � � � � � � � �
<br /> ❑Backhoe
<br /> ❑Laser,transit or level Quick4 Plus Standard and Quick4 Plus High Capacity chambers may only be installed
<br /> ❑Shovel and rake according to State and/or local regulations. If unsure of the installation requirements
<br /> ❑Tape measure for a particular site,contact the local health department.
<br /> ❑Screwdriver or utility knife
<br /> ❑Hole saw Like conventional systems, the soil and site conditions must be approved prior to
<br /> ❑2-inch drywall screws' installation. Conduct a thorough site evaluation to determine the proper sizing and
<br /> ❑Screw gun' siting of the system before installation.
<br /> ❑Small valve-cover box'
<br /> ❑4-inch cap for Inspection port• Quick4 Plus Standard Quick4 Plus High Capacity
<br /> 'Optional ,(�, ,(�,��_,,f���
<br /> �i �i 1 a!� ��-� II� � �
<br /> � i� Ic� i in i � �
<br /> These guidelines for construction machinery �e �� �_ � C_ � I, �i��E'��� � �"'i jij�� �h i-V'i���� i�o i�, ���u �i ;{�j��i,
<br /> - , iii� �ea a��f i� �� �� �. I l�i I i,i,� i;I I�k1� �'�
<br /> must be followed during installation. _- _ - -- b - �"� ( i 3� �r.Ii,�
<br /> � i u L� �,i I
<br /> — _ _ _ _ = i �;' i �-- I ii irl� q ���i ii� �ill� f�
<br /> ❑Avoid direct contact with chambers when using — -_ - _ = _ -----
<br /> 48' _I
<br /> construction equipment.Chambers require EFFECTN IENGTH EFFECTIVELENGTH
<br /> a 12-inch minimum of compacted cover to
<br /> support a wheel load rating of 16,000 Ibs/axle or _..__
<br /> equivalent to an H-10 AASHTO load rating.
<br /> 16•'
<br /> ❑Only drive across the trenches when necessary. � � �
<br /> Never drive down the length of the trenches. f`�n
<br /> ❑To avoid additional soil compaction,never drive � � a
<br /> heavy vehicles over the completed system. r— 3a" -- �—a� —�
<br /> EXCAVATING AND PREPARING on front or side of ' ��� -��`� the first chamber. ;�-,� � ;-
<br /> THE SITE endcap using center � �� �, Be sure to line �;
<br /> point marking (see _ ' up the locking "'�
<br /> NOTE:As is the case with conventional I�lustration) as a guide. ,�, --. pins on the top '
<br /> systems,do not install the systems in wet of both the
<br /> conditions or in overly moist soils,as this _ chamber and '' '
<br /> causes machinery to smear the soiL . �--'�"4y"'"� endcap. � �
<br /> 1. Stake out location of trenches and lines. 5. Insert the �
<br /> Set elevations of the tank, i e, and trench �.�����`��`��`„
<br /> p P QUICK4 PLUS ALL-IN- inlet pipe 2.5 . _
<br /> bottom. ONE 12 ENDCAP DRILL LOCATIONS: inches into the ' "
<br /> 2. Install sedimentation and erosion control opening on the 5.�""" ""+ p'pE'
<br /> measures. Tem ora draina e swales/ E"°°HS'°Ea'"°E�r T°P,z''"`'ER'S � -- �'�`%;'.'°R'""`�'c�"
<br /> p ry g �����rv�H�EroR o�r�Er, ��ti�E,oR o�r�E1, endcap. r
<br /> berms may be installed to protect the site � s=S��N�ERT 6. Lift and place _ •-
<br /> (GiYAVITY INLET
<br /> during rainfall events. ,PRESS�RE OROUTLET) the end of the
<br /> LFTERNL(TVP.) END OR SIDE�.15'INVERT
<br /> 3. Excavate and level 2-foot wide trenches �FORM�o-��NE�o��E�T�o� next chamber �
<br /> 1'PRESSURE ORLOOPED ENDS) • .,
<br /> with proper center-to-center separation. �ATERA�„vP, _ onto the previ- -a�
<br /> Verify trenches are level or have pre- ous chamber , r:^
<br /> scribed slope. 2. Snap off the molded splash plate locat- by holding it ' ' �`
<br /> NOTE: Over excavate the trench width in ed on the bottom front of the endcap. at a 45-degree ,
<br /> areas where you are planning to contour. 3. Install splash plate into the appropriate angle. Line up
<br /> slots below inlet to revent trench bottom the chamber s.co�,�,e���hd��,�,e�s
<br /> 4. Rake bottom and sides if smearing has p
<br /> occurred while excavating. Remove any erosion. end between
<br /> large stones and other debris. Do not use the connector hook and locking pin at the
<br /> the bucket teeth to rake the trench bottom. INSTALLING THE SYSTEM top of the first chamber. Lower the cham-
<br /> ber to the ground to
<br /> 5.Verify that each trench is level using a �, Check the header pipe to be sure it is connect the chambers.
<br /> level, transit, or laser. Ievel or has the prescribed slope.
<br /> NOTE:When the chamber end is placed
<br /> 2. Set the inver' r �'^"1 � � - '�� the between the connector hook and locking
<br /> PREPARING THE QUICK4 PLUS design from thE ��,���� pin at a 45-degree angle, the pin will be
<br /> ALL-IN-ONE 12 ENDCAPS bottom of the _'�< .�°";
<br /> � visible from the back side of the chamber.
<br /> inlet.
<br /> NOTE:The C�uick4 Plus All-in-One 12 3. Place the firs . ` " NOTE:The connector hook serves as a
<br /> Endcap is compatible with the Quick4 Plus �� guide to ensure proper connection and
<br /> Standard and Quick4 Plus Hi h Ca aci chamber in the .�•
<br /> 9 P tY � does not add structural integrity to
<br /> chambers, and can be used on either end trench.
<br /> i '� chamber joint. Broken hooks will not affect
<br /> of the trench,depending upon the installer's 4. Place the ;,�';� � '� the structure or void the warranty.
<br /> preference and configuration requirements. back edge of r;F, , �, A-
<br /> , the endcap ove ��� >r ,�
<br /> 1.With a hole saw drill a 4h-inch opening � F .a, '' .�
<br /> the inlet end of �..
<br /> �. �.. , ���,�c�e�,d.
<br /> Contact Infiltrator Systems Inc.1-800-221-4436 for additional technical and product information.
<br />
|