Laserfiche WebLink
Materials and Equipment Needed � � <br /> ❑Quick4 Plus chambers ' I � � � � � ' I <br /> ❑Quick4 Plus All-In-One 12 endcaps <br /> ❑PVC pipe and couplings � � � � � � � � � � � <br /> ❑Backhoe <br /> ❑Laser,transit or level Quick4 Plus Standard and Quick4 Plus High Capacity chambers may only be installed <br /> ❑Shovel and rake according to State and/or local regulations. If unsure of the installation requirements <br /> ❑Tape measure for a particular site,contact the local health department. <br /> ❑Screwdriver or utility knife <br /> ❑Hole saw Like conventional systems, the soil and site conditions must be approved prior to <br /> ❑2-inch drywall screws' installation. Conduct a thorough site evaluation to determine the proper sizing and <br /> ❑Screw gun' siting of the system before installation. <br /> ❑Small valve-cover box' <br /> ❑4-inch cap for Inspection port• Quick4 Plus Standard Quick4 Plus High Capacity <br /> 'Optional ,(�, ,(�,��_,,f��� <br /> �i �i 1 a!� ��-� II� � � <br /> � i� Ic� i in i � � <br /> These guidelines for construction machinery �e �� �_ � C_ � I, �i��E'��� � �"'i jij�� �h i-V'i���� i�o i�, ���u �i ;{�j��i, <br /> - , iii� �ea a��f i� �� �� �. I l�i I i,i,� i;I I�k1� �'� <br /> must be followed during installation. _- _ - -- b - �"� ( i 3� �r.Ii,� <br /> � i u L� �,i I <br /> — _ _ _ _ = i �;' i �-- I ii irl� q ���i ii� �ill� f� <br /> ❑Avoid direct contact with chambers when using — -_ - _ = _ ----- <br /> 48' _I <br /> construction equipment.Chambers require EFFECTN IENGTH EFFECTIVELENGTH <br /> a 12-inch minimum of compacted cover to <br /> support a wheel load rating of 16,000 Ibs/axle or _..__ <br /> equivalent to an H-10 AASHTO load rating. <br /> 16•' <br /> ❑Only drive across the trenches when necessary. � � � <br /> Never drive down the length of the trenches. f`�n <br /> ❑To avoid additional soil compaction,never drive � � a <br /> heavy vehicles over the completed system. r— 3a" -- �—a� —� <br /> EXCAVATING AND PREPARING on front or side of ' ��� -��`� the first chamber. ;�-,� � ;- <br /> THE SITE endcap using center � �� �, Be sure to line �; <br /> point marking (see _ ' up the locking "'� <br /> NOTE:As is the case with conventional I�lustration) as a guide. ,�, --. pins on the top ' <br /> systems,do not install the systems in wet of both the <br /> conditions or in overly moist soils,as this _ chamber and '' ' <br /> causes machinery to smear the soiL . �--'�"4y"'"� endcap. � � <br /> 1. Stake out location of trenches and lines. 5. Insert the � <br /> Set elevations of the tank, i e, and trench �.�����`��`��`„ <br /> p P QUICK4 PLUS ALL-IN- inlet pipe 2.5 . _ <br /> bottom. ONE 12 ENDCAP DRILL LOCATIONS: inches into the ' " <br /> 2. Install sedimentation and erosion control opening on the 5.�""" ""+ p'pE' <br /> measures. Tem ora draina e swales/ E"°°HS'°Ea'"°E�r T°P,z''"`'ER'S � -- �'�`%;'.'°R'""`�'c�" <br /> p ry g �����rv�H�EroR o�r�Er, ��ti�E,oR o�r�E1, endcap. r <br /> berms may be installed to protect the site � s=S��N�ERT 6. Lift and place _ •- <br /> (GiYAVITY INLET <br /> during rainfall events. ,PRESS�RE OROUTLET) the end of the <br /> LFTERNL(TVP.) END OR SIDE�.15'INVERT <br /> 3. Excavate and level 2-foot wide trenches �FORM�o-��NE�o��E�T�o� next chamber � <br /> 1'PRESSURE ORLOOPED ENDS) • ., <br /> with proper center-to-center separation. �ATERA�„vP, _ onto the previ- -a� <br /> Verify trenches are level or have pre- ous chamber , r:^ <br /> scribed slope. 2. Snap off the molded splash plate locat- by holding it ' ' �` <br /> NOTE: Over excavate the trench width in ed on the bottom front of the endcap. at a 45-degree , <br /> areas where you are planning to contour. 3. Install splash plate into the appropriate angle. Line up <br /> slots below inlet to revent trench bottom the chamber s.co�,�,e���hd��,�,e�s <br /> 4. Rake bottom and sides if smearing has p <br /> occurred while excavating. Remove any erosion. end between <br /> large stones and other debris. Do not use the connector hook and locking pin at the <br /> the bucket teeth to rake the trench bottom. INSTALLING THE SYSTEM top of the first chamber. Lower the cham- <br /> ber to the ground to <br /> 5.Verify that each trench is level using a �, Check the header pipe to be sure it is connect the chambers. <br /> level, transit, or laser. Ievel or has the prescribed slope. <br /> NOTE:When the chamber end is placed <br /> 2. Set the inver' r �'^"1 � � - '�� the between the connector hook and locking <br /> PREPARING THE QUICK4 PLUS design from thE ��,���� pin at a 45-degree angle, the pin will be <br /> ALL-IN-ONE 12 ENDCAPS bottom of the _'�< .�°"; <br /> � visible from the back side of the chamber. <br /> inlet. <br /> NOTE:The C�uick4 Plus All-in-One 12 3. Place the firs . ` " NOTE:The connector hook serves as a <br /> Endcap is compatible with the Quick4 Plus �� guide to ensure proper connection and <br /> Standard and Quick4 Plus Hi h Ca aci chamber in the .�• <br /> 9 P tY � does not add structural integrity to <br /> chambers, and can be used on either end trench. <br /> i '� chamber joint. Broken hooks will not affect <br /> of the trench,depending upon the installer's 4. Place the ;,�';� � '� the structure or void the warranty. <br /> preference and configuration requirements. back edge of r;F, , �, A- <br /> , the endcap ove ��� >r ,� <br /> 1.With a hole saw drill a 4h-inch opening � F .a, '' .� <br /> the inlet end of �.. <br /> �. �.. , ���,�c�e�,d. <br /> Contact Infiltrator Systems Inc.1-800-221-4436 for additional technical and product information. <br />