Laserfiche WebLink
Infiltrator IM- and TW-Series Septic JANUARY2014 <br /> Tank General Installation Instructions �NFILTRATOR� <br /> � tanks <br /> BEFORE YOU BEGIN points provided at each of the inlet and outlet ports according to the applicable <br /> Infiltrator Systems'tanks must be installed according to state and/or local Inlet and Outlet Hole Locations section of this document.The inlet and outlet <br /> regulations,which supersede the manufacturer's installation instructions. may be drilled on either the sides or ends of the tank,as required based on <br /> If unsure of the installation requirements for a specific site,contact the health applicable codes and site conditions' <br /> department or permitting authority.The IM-Series referred to in this document 'Indiana,Kentucky,Oregon,West Virginia,and certain florida and Texas <br /> includes the IM-540,IM-1060,and IM-1530 tanks.The TW-Series includes the tanks are factory-drilled. <br /> TW-1250 and TW-1500 tanks. 3.The gaskets supplied with the tank are compatible with Schedule 40 and SDR <br /> AWARNING:IMPLOSIONS MAY CAUSE SERIOUS INJURY 35 pipe using a 5-inch-diameter(125 mm)hole saw with IM-Series tanks,and <br /> Follow Infiltrator Systems Inc.vacuum test instructions a 5'/a-inch-diameter(133 mm)hole saw with TW-Series tanks. <br /> 4.Install the rubber gaskets at the inlet and outlet. <br /> ' • ' ' S.Using all four of the tank's integral lifting lugs,lower tank into excavation. <br /> Infiltrator tank Shovel 6.Slide the inlet and outlet pipes'through the gaskets.Soapy lubricant may <br /> be used to slide the pipe in. <br /> �i Access port lid(s)' C,Level 'For North Carolina,the inlet pipe shall be a straight pipe with no tee. <br /> ❑10 screws per lid` ❑5-inch-diameter(125 mm) 7, Horizontally position the tee 1Yz inches(40 mm)from the access port rim, <br /> �2 inlet/outlet gaskets hole saw(IM-Series only) allowing the tee to fit into the recess in the access port lid(see detail). <br /> (included) ❑5.25-inch-diameter(133 mm) 8,Install lids and risers(see Installing Risers section)as necessary.Rotate lid <br /> �:.,Inlet/outlet tees` hole saw(TW-Series only) over access opening until it indexes to tank and drops into position. <br /> C Ta pe m easu re ❑Ut i I ity kn ife POSITON TEE 1 5"in(40 mm, <br /> ��'. I FROMPORTRIM <br /> ❑Pipe,risers,etc. ❑PVC pipe glue with primer A�cessPORTR�M <br /> ❑Socket wrench �"s"ET _ <br /> 'tee and lid inclusion varies by � <br /> ❑Excavator state/province j nccess <br /> � OPENING <br /> uo <br /> INSTALLATION SITE SELECTION TANK WA�� — rANK —�N�TTEE <br /> �IM-tO605HOWN) INTERIOR (TYPIGAL� <br /> 1.Do not install the tank in vehicular traffic areas.The tank is designed for <br /> non-traffic applications. <br /> 2.The allowable soil cover depth is 6 to 48'inches(150 to 1,200 mm). ��s�o,�M-,oeo,wo�n+,5�o s5��n 3�smm, <br /> '18-inch(450 mm)max.in Florida for Cat.3 IM-and TW-Series tanks; , Tw-+z5onuo,w-,wo 5,��n.s�5 mmi <br /> %��l'�'��i�'. '��'i��T�L' <br /> 48-inch(1,200 mm)max.in Florida for Cat.4 IM-Series tanks;36-inch y�����, — �– -- � �v�l <br /> (900 mm)max.in Massachusetts,New Hampshire,North Carolina,and Oregon. � <br /> 3.The tank shall not be installed where the subsurface water level outside the tank > � � �`� <br /> exceeds the height of the outlet pipe saddle.Follow Table 4 guidelines. �, i „���,,,,�t � <br /> EXCAVATING AND PREPARING THE SITE j� � �� <br /> i.Unless buoyancy control measures are required,the excavation width and ���� , <br /> ���u�/�'���r�� �/'�� ������ <br /> length should be 18 to 36 inches(450 to 900 mm)larger than the tank on each <�,�,�������l,�j;��,�1,�,��,�,,�,,�;�� <br /> side or sized as necessary to ensure proper backfill compaction,as outlined <br /> in Steps 5-10 of"Backfilling the Tank"in this document.See Infiltrator IM- gACKFILLING THE TANK <br /> and TW-Series Tank Buoyancy Control Guidance document,available online <br /> at www.infiltratorsystems.com,for specific excavation requirements when Note:Infiltrator tanks do not require filling with water prior to backfill <br /> installing buoyancy control measures. placement.Water filling and backfilling to the tank mid-height is required <br /> 2.Excavation depth shall account for the height of tank(55 inches(1,375 mm) if the tank is left in either an open or backfilled excavation that may fill <br /> for the IM-Series tanks and 51 inches(1,275 mm)for the TW-Series tanks). with water from rain or other sources. <br /> Also account for 4 inches(100 mm)of bedding(if required)and cover depth 1•Backfill with suitable native soil(max.3-inch(75-mm)stone diameter).If native <br /> (permissible cover depth is 0.5 to 4 feet(150 to 1,200 mm)of soil). soil is unsuitable,replace unsuitable fraction with suitable soil.If suitable soil is <br /> Note:If the water level outside the tank exceeds the height of the outlet not locally available,contact Infiltrator Systems for assistance. <br /> pipe saddle,tank structural integrity may be compromised.Follow 2.Suitable soil shall include soil textural classes defined in the United States <br /> Table 4 guidelines. Department of Agriculture soil triangle.Suitable soil textural classes are based <br /> 3.Inspect bottom ot excavation to verify suitability of native soil for tank on the tank installation depth,as measured from finished grade to the top of <br /> installation.Soils with large,protruding,or sharp stones or other similar objects tank. <br /> that may damage the tank are not suitable. a)For a tank soil cover depth of 0.5 to 2.0 feet(150 to 600 mm),suitable soil <br /> 4.The tank may be installed either in suitable native soil(see Backfilling the Tank textures include: <br /> section or a minimum 4-inch 100 mm la er of well- raded ranular soil havin �����c�pv �E` , <br /> ) ( ) Y 9 9 9 0��s���ab�e �I <br /> particles less than 3 inches(75 mm)in diameter,or maximum 0.5-inch(13 mm) s�rtaaa il <br /> diameter crushed stone. � '° s°"ab1e1tli1atant <br /> 5.Create a uniform,compacted,level surface to ensure that the bottom of the ao p "'"a"Sa�°"�v <br /> ----J <br /> Por sites with greater than 50%na�ive <br /> tank is evenly supported.Verify that the installation surface is flat. , ��q� o day soil,6ackfill shall 6e septic grevel <br /> ��o���a� or similar angular s�one,sized 1/2-inch <br /> � f—�,E��oo;,en � Io1-1/2inches. <br /> �/�/° s�n.�a��n ..�ke��,�oawe �/l./l�/`�'�`Y�, ao <br /> .�/ . .e 6�,`a e mmi m��.�m �yT����%� <br /> �` PefceM CLA� 50 Percenl5lLT <br /> �� SILTV <br /> NIS�O,M-tO60antlIM-1530'.SSIn(1.315mm) � ��qN ��qy <br /> rnizm n�e.wisoa:si m�i ns mm� , <br /> vNa Beeene�a�n(n Requ.eel ��� - LAV <br /> / GLAV Ctq SI TCLAV <br /> Cmqvuietl Sunade Naf 5 9� � / LOAM ]0 <br /> G b M rW SAN GL�V <br /> /l��777 ���D <br /> i��/i��/��/i��/i�/�/����i��/���/iy%%i\/l�/i���i\��i\\i\i\\�j\�j\� 5 ers�l IlaaiYV L AM I<iP.M <br /> tiLTLO <br /> INSTALLING THE TANK ��a �A"°��°" s�� �' <br /> 100"ie5l.N�. SAN SNN 100°%SILT <br /> 1.Inspect the tank for damage before installation. , „ <br /> 2.If the tank inlet and outlet penetrations are not drilled,drill holes using the drill e�_e���A��� ,,, ',o;,' <br /> - �-.. :�� <br />