My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-006632 - new septic system
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2860 Deer Run Trail - 04-117-23-24-0014
>
Permits/Inspections
>
1994-006632 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:10:54 PM
Creation date
6/16/2016 3:07:15 PM
Metadata
Fields
Template:
x Address Old
House Number
2860
Street Name
Deer Run
Street Type
Trail
Address
2860 Deer Run Tr
Document Type
Permits/Inspections
PIN
0411723240014
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r , <br /> S'P TESTING, INC. Steven B. Schirmers — MPCA Cert. Na. 627 <br /> � 1 <br /> 951 Katydid Lane NE • St. Michaei, MN 55376 • (612) 497-3566 <br /> December 15 , 1993 <br /> Coffin site <br /> Lot 9 , Block 1 <br /> Orono, Henn. Co . , MN <br /> This On-Site Sewage Treatment System is Designed for a Type 1 , five <br /> bedroom home i;i ac:�ordance with the Minnesota Polluti�n Control <br /> Agency Chapter 7080 anc? loc�l ordinances . <br /> The soils on this site are SCS soils mapped - LrB - ��ester loam. <br /> A seasonally high water table was located at 22" to 3�" , (mottled <br /> soil ) . Due to the seasonally high water table , a Pressurized <br /> Mour.� System will 21P.Pc� to be installed . The bottor� oF the rock <br /> bed must be located at l�ast 3 ' above the seasoiially high water <br /> table . <br /> The soils at a depth of 1?" have a percolation rate av�raging <br /> 4 . 1 in TH ' s #3 , 4 & 5 . <br /> A pumping chamber will ileed to be installed ta iift the effluent <br /> to the treatment area . <br /> The manifold and supply line pipe must have back drainage to t:�e pum�ing <br /> chamber . The distribution pipes shall have their ends capped . Be sure <br /> the rock and sand fill material are clean. The sod layer below the <br /> entire mounded area must be turned over, just break up the sod , be sure <br /> not to over work . <br /> The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure . A warning device must <br /> be installed wit:z a iight and soizn:� device , this is in case of a pump <br /> failure . Mercury floats are a good method. <br /> Al1 neighboring wells are located greater than 100 ' away from the <br /> proposed treatment area . <br /> CONT ' D <br />
The URL can be used to link to this page
Your browser does not support the video tag.