Laserfiche WebLink
'gvv �.� CITY OF OROI�'O <br /> SEPTIC SYSTENi A,PPROVAL <br /> ��. � <br /> ���� �ITY of ORO�TO <br /> ,� �. <br /> � ����.,�.�;b � <br /> �7 , n 2_ �, Municipal OtTices <br /> � `u t �d y �. Posi Oft'�ce Box 66 <br /> �L� t� ������J Crystal Bay.Minnesota 553Z3-0066 <br /> kESH�� <br /> LOCATION: 2860 Deer Run Trail <br /> OWNER: Mike Gillen <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: S-P Testing REpORT DATE: December 15, 1993 <br /> The City of Orono has Approved your on-site system design as of October 19, 19 9 4 <br /> (approved-disapproved) (date) <br /> wi[li the following corrunents: <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior[o building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings wiil not be gran[ed until tlie Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely comple[ion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF ORON <br /> By � . ,_.., �_� ' <br /> Stephen W an, On-site Systems Manager <br /> TELEPI IONE—473-7357•FAX-473-0510 <br />