My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10221 - new septic system
Orono
>
Property Files
>
Street Address
>
D
>
Deborah Drive
>
510 Deborah Drive - 31-118-23-23-0006
>
Septic
>
2006-P10221 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:30:00 PM
Creation date
6/16/2016 12:30:47 PM
Metadata
Fields
Template:
x Address Old
House Number
510
Street Name
Deborah
Street Type
Drive
Address
510 Deborah Drive
Document Type
Septic
PIN
3111823230006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. PUMP SELECTION PROCEDURE <br /> 1. Determine pump capacity: <br /> A. Gravity distribution <br /> 1. Minimum required discharge is 10 gpm <br /> 2. Maximum suggested discharge is 45 gpm. For other <br /> estaUlishments at least 10%greater than the water supply rate, <br /> but no faster than the rate at which effluent will flow out of the <br /> distribution device. <br /> B. 1'ressure distribution <br /> See pressure distribution work sheet <br /> From A or � Selected pump capacity: �_ gpm <br /> 2. Deterrr►ine pump head requirements: <br /> A. Elevation difference between pLunp and point of discharge? soil treatment system <br /> 1� feet &point of discharge <br /> . . QiOQ°D�°:�e:. / / <br /> B. Special head requirement? (See Figure at right - Special Head Requirements) total pipe <br /> length <br /> 5 feet � 2A,elevation <br /> inlet ;r;...;,;,.;.,,<.;.; . <br /> C. Calculate Friction loss -- difference <br /> P�Pe :�. <br /> . <br /> ��. ------- -- -= <br /> 1. Select pipe diameter a.c� in ` <br /> ,. <br /> `� � � I <br /> , <br /> ----------------------------- ------ <br /> 2. Enter Figure E-9 with gpm (lA or B) and pipe diameter (C1). <br /> Read friction loss uz feet per 100 feet from Figure E-9 Special Head Requirements <br /> Friction Loss = �•� ft/100ft of pipe Gravity Distribution 0 ft <br /> 3. Detei-mine total pipe length froin pump discharge to soil treatment Pressure Distribution 5 ft <br /> discharge point. Estimate by adding 25 percent to pipe length for <br /> fitting loss. Total pipe length tirnes 1.25 = equivalent pipe ler�gth <br /> E-9: friction Loss in Plostic Pipe <br /> 1'�Q feet x 1.25 = a o� feet <br /> Per 100 feet <br /> 4. Calculate total,friction loss by multiplying friction loss (C2) nominol <br /> in ft/100 ft by the equivalent pipe length (C3) and divide by 100. pipe diameter <br /> _ �.(o ft/100ft x ���-� =100 - 7 ft tlow rate 1.5" 2" 3" <br /> - pm <br /> D. Total head required is the sum of elevation difference (A),special 2� 2.47 OJ3 0.11 <br /> head requirements (B), and total friction loss (C4) 25 3.73 1.11 0.16 <br /> / �ft+ 5` ft+ 7 ft= 30 5.23 1.55 0.23 <br /> 35 6.96 2.06 0.30 <br /> T�$al �e�C�: a� fe�� 40 8.91 2.64 0.39 <br /> 3. Pump �electioy� a5 11.07 3.28 o.aa <br /> 50 13.46 3.99 0.58 <br /> 55 4.76 0.70 <br /> A pump must be selected to deliver at least�gpm 60 5.60 0.82 <br /> (1A or B) with at least a`� feet of total head (2D) 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> I hereby certify that I have co pleted this work in accordance with applicable ordinances, rules and laws. <br /> �'� �. <br /> � � � �' `�w------ (signature) 3�l (license#) ��0�0---C?�j (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.