My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10221 - new septic system
Orono
>
Property Files
>
Street Address
>
D
>
Deborah Drive
>
510 Deborah Drive - 31-118-23-23-0006
>
Septic
>
2006-P10221 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:30:00 PM
Creation date
6/16/2016 12:30:47 PM
Metadata
Fields
Template:
x Address Old
House Number
510
Street Name
Deborah
Street Type
Drive
Address
510 Deborah Drive
Document Type
Septic
PIN
3111823230006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G, MC�UND SLOPE WIDTH & LENGTH Landslope > 1% slope <br /> � (landslope greater than 1%) v d o�e�� <br /> 1. Downslope absorption width = absorption width (F) � ° �� <br /> o a o <br /> minus rock layer width (D2) ' °� °p�a��g� P <br /> ! s•Ta 5oa <br /> (� ( ��,� i . CleanSand!•�7ft ���i <br /> ��� / 1 l - { � ft = �_ft eparat on��2�'} ft � � ��� <br /> Reslri<ling Layer <br /> Upslope Wideh(G2d) Rock W' lh(D2) ��'nslope Wid�h(G2i) <br /> 2. Calculate mound size q " __ _��'_f� �� H <br /> UPSLOPE <br /> a. Depth of clean sand fill at upslope edge of <br /> Absoryljq�Widflh�Sand(F� <br /> rock layer = 3 ft minus the distance to restricting layer (C1) `� <br /> 3ft- a �-r- ft = .D ft <br /> b. Mound height at the upslope edge of rock D-34: SLOPE MULTIPLIER TABLE <br /> layer = depth of clean sand for separation (G2a) L�,a UPSLOPE DOWNSLOPE <br /> at u slo e ed e lus de th of rock layer (1 ft) s,o�e mullipliers forvarious �,�,��pliers forvarious <br /> p p g p p �� slope ratios slope ratios <br /> plus depth of cover (1 ft) 3:] 4:1 5:1 6:1 7:1 8:1 3:1 4:1 5:] 6:1 7:1 <br /> � � ft + 1ft + lft = � . P ft 0 3.0 9.0 5.0 6.0 7.0 8.0 3.0 4.0 5.0 6.0 7.0 <br /> c. Upslope berm multiplier based on land slope 1 Z•91 3.85 4.76 5.66 6.59 7.41 3.09 4.17 5.26 6.38 7.53 <br /> .� �Z (see figure D-34) 2 Z•83 3.70 4.54 5.36 6.14 6.90 3.19 4.35 5.56 6.82 8.14 <br /> . <br /> d. Upslope width = berm multiplier (G2c) times 3 Z•�5 3.57 9.35 5.08 5.79 6.45 3.30 4.54 5.88 7.32 8.66 <br /> 9 2.68 3.45 4.17 9.89 5.46 6.06 3.91 4.76 6.25 7.89 9.72 <br /> upslope mound height (G2b): <br /> 5 2.61 3.33 4.00 4.62 5.19 5.71 3.53 5.00 6.67 8.57 10.77 <br /> 3�t`z. x 3 ft = �_ ft <br /> 6 2.54 3.23 3.85 4.41 9.93 5.91 3.66 5.26 7.14 9.38 12.07 <br /> D04VNSLOPE 7 2.48 .12 3.70 4.23 4.70 5.13 3.80 5.56 7.69 10.34 13.73 <br /> e. Drop in elevation = rock layer width (D2) times 8 Z.g2 3.03 3.57 4.05 9.49 4.88 3.95 5.88 8.33 11.54 ]5.91 <br /> percent landslope (C5) = 100 . 9 2.36 2.99 3.45 3.90 4.30 9.65 4.11 6.25 9.09 ]3.04 ]8.92 <br /> �� ft X �_%_T 1�� _ !�_lt ]0 2.31 2.86 3.33 3.75 9.12 4.99 4.29 6.67 ]0.00 ]5.00 23.33 <br /> f. Downslope mound height = depth of clean 11 2.26 2.78 3.23 3.61 3.95 4.26 9.48 7.14 ]l.l] ]7.65 30.93 <br /> sand for slope difference (G2e) at downslope � Z•Zl 2.70 3.12 3.99 3.80 4.08 4.69 7.69 12.50 21.93 93.75 <br /> rock edge plus the mound height at the <br /> upslope edge of rock layer (G2b) <br /> ,� ft + �') ft = �. ft <br /> g. Downslope berm multiplier based on percent land slop <br /> S�S�- (see figure D-34) ' ��� - <br /> h. Downslope width = downslope multiplier � �'�� �� <br /> Upslope Wii th(G4d) <br /> (G2g) times downslope mound height (G2� �o <br /> �'•�G"� X �-��•�� ft = a I 1 t ' Rock Bed <br /> m Upslo e Width(G2d) � Upslope Width(G2d) <br /> � �.�ft Width(D2) �� �_ft <br /> i. Select the greater of G1 and G2h as the � LengUi(D3) �� <br /> downslope width: a ) ft � ` Downslope Width(G2i) a► f, <br /> j. Total mound width is the sum of upslope � AbsorP[ion Width(F) 17 <br /> width (G2d) width plus rock layer width �-' <br /> (D2) plus downslope width (G2i) Total Leng[h(G2k) 10`� f� <br /> �_ ft + �o ft + �_ft = �_ft <br /> k. Total mound length is the sum of upslope width (G2d) <br /> plus rock layer length (D3) plus upslope width (G2d) <br /> �ft + t�� ft + �_ ft = � feet <br /> a� a- (��, -�- a, M �o� <br /> Final Dimensions: <br /> ��o� x _ 9a'��- <br /> I hereby certify that I have ompleted this work in accordance with applicable ordinances, rules and laws. <br /> G��.=._.�� l ..x- _�_.,__.�.,_� � <br /> - -- - (signature) �`�7'-} (license#) S-�� Ot.► (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.