My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/17/03 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2000-2009
>
2003
>
11/17/03 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2012 4:04:04 PM
Creation date
2/27/2012 4:04:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday, November 17, 2003 <br /> 6:00 o'clock p.m. <br /> (#11) #03-2961 NINA WILDMAN, 745 SPRING HILL ROAD, PRELIMINARY <br /> PLAT, Continued <br /> 4. The portions of private driveway/road serving multiple homes is generally only 12- <br /> 14' in paved width, and at the point it enters the applicant's property is approximately <br /> 1000' from Spring Hill Road. <br /> 5. The private driveway proposed to serve a new residence on Lot 2 will extend an <br /> additional 1600' into the property; that house will be 2600' or about 1/2 mile from Spring <br /> Hill Road. <br /> Gaffron pointed out that Fire Marshal Bill Meyer was asked to comment regarding the <br /> access standards required for emergency vehicles. Meyer has indicated the access should <br /> be brought up to the Minnesota Uniform Fire Code standards, which include: 1) an <br /> unobstructed road width of 20', 2) surfaced to support the imposed loads of and provide <br /> all-weather driving capabilities for fire apparatus, 3) for any segment of private road or <br /> driveway serving more than two homes. <br /> The City Engineer has suggested that the potential use of the roads be considered in <br /> determining what road width standard to use, and notes that the minimum width for 3-6 <br /> dwelling units would be 24'. <br /> Based on Orono Code Section 82-282 regulating access to subdivisions, Gaffron explained <br /> that the City has the authority to require improvements to the private road as a condition <br /> of subdivision approval, should the City so choose. The applicant would have to determine <br /> whether such improvements would be allowed under the terms of the various easements <br /> providing access to the site. The City should require an underlying `Road, Drainage and <br /> Utility Easement' for the entire corridor; again, the question is whether the applicant has <br /> the ability to provide such an easement. Inability or refusal to meet the City requirement <br /> could be a basis for subdivision denial. <br /> With regard to a Staff Recommendation regarding road improvements, Gaffron stated that, <br /> despite the complexities imposed by the easement situation, based on the code <br /> requirements staff must recommend that a 50' corridor be platted from Spring Hill Road to <br /> the proposed cul-de-sac loop, and a 24'paved private road be constructed within that <br /> corridor. This may not be to the liking of the owners and users of the road, as it will <br /> change the character of the area. Further, actual construction of such a road potentially <br /> would require wetland encroachments in the cartway area. Gaffron recommended the <br /> Planning Commission discuss whether there is a basis to allow the proposed subdivision <br /> without requiring road upgrades or at least corridor dedications. <br /> As the subdivision will be trigger park dedication, the proposal will be submitted to the <br /> Park Commission for their review in early December, to determine whether land <br /> dedication is required or merely a park fee for each of the two new building sites (Park Fee <br /> PAGE 23 of 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.