My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/21/03 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2000-2009
>
2003
>
04/21/03 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2012 3:46:20 PM
Creation date
2/27/2012 3:46:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,April 21,2003 <br /> 6:00 o'clock p.m. <br /> (#11 #03-2889 RAVIA REAL ESTATE,LLC, Continued) <br /> Forestview (8.2 stalls per unit)was nearly full at 5:40 p.m. and there was overflow parking <br /> occurring on the adjacent street. In Gaffron opinion, this site had a parking issue. <br /> Gaffron reported that the applicants were proposing an initial parking ratio of 71 stalls per <br /> 13 units or 5.5 stalls per unit, with a maximum potential for 113 stalls or 8.7 stalls per unit. <br /> By contrast, Orono code would require 15 stalls per unit. He maintained that, despite the <br /> attractiveness of leaving the proof-of-parking areas unbuilt and in green space for now, <br /> staff would hesitate to recommend approval of parking at any level less than 10 stalls per <br /> unit in order to eliminate the likelihood of overflow parking at the Senior Housing or <br /> Orono Shopping Center lots. Gaffron acknowledged that the office use would most likely <br /> consist of low traffic appraisal or insurance offices, however, one could not be sure this <br /> would be the case. <br /> With regard to their water management plan, Gaffron explained that all roof and parking <br /> lot runoff would be collected via catch basins and transported via underground storm <br /> sewers to the existing storm sewer system serving the Senior Housing site, discharging to <br /> the existing NURP pond located at the northwest corner of Brown Road North and <br /> Highway 12. Gaffron pointed out that capacity and design of this pond were previously <br /> deemed acceptable by MnDOT, the Minnehaha Creek Watershed District and the City for <br /> development of this site for Office use under the PUD No. 2 approvals. <br /> The City Engineer has requested that a drainage area map and storm sewer calculations be <br /> provided by the applicants, as well as evidence that the downstream storm sewer has the <br /> capacity to serve the proposed use. Gaffron noted that revised drainage calculations would <br /> be required from the developer to confirm there are no drainage issues if the current <br /> proposal goes forward as well. <br /> Gaffron pointed out that the topography of Lot 1 is significantly higher than the adjacent <br /> parcels on either side, with its high point near the northeast corner. The land slopes to the <br /> northeast, southeast and southwest from this point. Existing grade level rises 28' from the <br /> southeast corner of Lot 1 to the high point at the rear. The existing home in Sugar Woods <br /> directly behind Lot 1 is at or slightly above the highest elevation on Lot 1. <br /> Furthermore, at the south end of SE building, a retaining wall up to 6' high would be <br /> needed along the north side of the service drive, due to the grade needed to gain access to <br /> the site from the Senior Housing Highway 12 access. As viewed from Highway 12, the <br /> south end of the property would consist of a grassy slope, the service road, the retaining <br /> wall, and the 48' wide 2-level façade with windows. Gaffron noted that the City Engineer <br /> indicated the grade of the access road at the southeast and northwest ends of the site <br /> exceeds 12% and should be revised to not exceed 8%. This may have some impacts on the <br /> parking lot grades, which should be reduced to not exceed 4% (as submitted, parking lot <br /> grades are 0% - 5%). <br /> PAGE 20 of 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.