My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-19-2001 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2000-2009
>
2001
>
11-19-2001 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2012 2:25:58 PM
Creation date
2/27/2012 2:25:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> MONDAY,NOVEMBER 19,2001 <br /> 6:30 o'clock p.m. <br /> (#01-2732 Revis Stephenson,Continued) <br /> 3. The MCWD shall issue an erosion control permit prior to issuance of a land alteration permit. <br /> 4. The flushing station located on the property shall be protected by fencing to ensure it will not be <br /> damaged during the project. <br /> 5. All slopes shall be restored with a minimum of four inches of topsoil and seeded or restored with <br /> some type of erosion control measure,erosion control plan shall be approved by the MCWD and <br /> City Engineer. <br /> 6. The property owner provide some type of financial guarantee that could be used to correct any <br /> damage to the road caused by the contractor's activities. <br /> 7. Fox Ridge Road is a residential street. The contractor shall place signs on Fox Ridge Road alerting <br /> other users of the road where the work will be taking place. <br /> 8. Temporary fencing shall be installed around the construction activity to separate the land alteration <br /> activity from the surrounding property. <br /> Stephenson stated he is adamant about protecting the wetlands in this area and is agreeable with most <br /> of the conditions listed in the Planner's Report. Stephenson requested clarification of Item#6 relating <br /> to the financial guarantee. Stephenson commented he was informed by the contractor that the road <br /> should not be damaged, noting the road currently is in poor shape. Stephenson stated the neighbors are <br /> supportive of this project since it will eliminate the steep slope,and that his intentions are to plant <br /> native grasses and trees in this area to help restore the area back to its natural state. <br /> Mabusth suggested the Applicant discuss the financial guarantee with the contractor. <br /> Weinberger stated the work is not expected to start until mid December, and if the ground is frozen by <br /> then,the hauling of the fill will not be as big of a concern. <br /> Stephenson indicated he has no control over when the fill will be brought in,with the project expecting <br /> to take between five and six days. <br /> Smith inquired whether the impact on the wetland over time would be better or worse with this project. <br /> Weinberger stated the City Engineer has indicated that the rate of water runoff will slow down by <br /> changing the grade in this area. In addition, vegetation will be planted in the areas where currently <br /> there is just dirt,which should help prevent erosion. <br /> Hawn recommended a deadline of May 30, 2002 be required for the landscaping and planting. <br /> Stephenson stated he does not have a problem with that requirement. <br /> Smith inquired whether the Applicant would be planting the same number of trees that will be <br /> removed. <br /> PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.