My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2010 Council Packet
Orono
>
City Council
>
2010
>
10-25-2010 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2015 10:41:18 AM
Creation date
2/24/2012 10:08:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Old Crystal Bay Road Reconstruction <br />Cost Estimate for Improvements <br />Optional Pedestrian Crossing Improvements <br />OPTION A: In-Street Pedestrian Signs <br />Item Unit Quantity Unit Price Total Price <br />In-Street Pedestrian Signs Crosswalk 12 1,000.00$12,000.00$ <br />Estimated Construction Cost 12,000.00$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 3,600.00$ <br />Total Estimated Cost 15,600.00$ <br />OPTION B: Imprinted Pavement <br />Item Unit Quantity Unit Price Total Price <br />Imprinted Pavement Crosswalk 12 4,000.00$48,000.00$ <br />Estimated Construction Cost 48,000.00$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 14,400.00$ <br />Total Estimated Cost 62,400.00$ <br />OPTION C: LED Signing <br />Item Unit Quantity Unit Price Total Price <br />LED Signing Crosswalk 12 7,000.00$84,000.00$ <br />Estimated Construction Cost 84,000.00$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 25,200.00$ <br />Total Estimated Cost 109,200.00$ <br />A-10 <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 40 of 42]
The URL can be used to link to this page
Your browser does not support the video tag.