Laserfiche WebLink
Old Crystal Bay Road Reconstruction <br />Preliminary Cost Estimate - Feasibility Report <br />Optional Sidewalk Improvements <br />8' CONCRETE SIDEWALK <br />Item Unit Quantity Unit Price Total Price <br />Common excavation CY 438 10.00$4,380.00$ <br />Class 5 gravel base TN 480 20.00$9,600.00$ <br />4" Concrete Sidewalk SF 17290 3.50$60,515.00$ <br />Concrete Pedestrian Curb Ramp SF 312 6.00$1,872.00$ <br />Truncated Dome Panel SF 52 35.00$1,820.00$ <br />Restoration LS 1 7,000.00$7,000.00$ <br />Estimated Construction Cost 85,187.00$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 25,556.10$ <br />Total Estimated Cost 110,743.10$ <br />8' BITUMINOUS TRAIL <br />Item Unit Quantity Unit Price Total Price <br />Common excavation CY 815 10.00$8,150.00$ <br />Class 5 gravel base TN 1,195 20.00$23,900.00$ <br />Geotextile Fabric SY 2,445 1.75$4,278.75$ <br />Bituminous Base TN 240 70.00$16,800.00$ <br />Bituminous Wear TN 180 70.00$12,600.00$ <br />Bituminous Material for Tack Coat GAL 100 3.50$350.00$ <br />Restoration LS 1 7,000.00$7,000.00$ <br />Estimated Construction Cost 73,078.75$ <br />+30% Contingencies, Fees, Capitalized Interest, and Bonding 21,923.63$ <br />Total Estimated Cost 95,002.38$ <br />A-9 <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 39 of 42]