My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2010 Council Packet
Orono
>
City Council
>
2010
>
10-25-2010 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2015 10:41:18 AM
Creation date
2/24/2012 10:08:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Orono Project No: 000139-10047-0 <br />Old Crystal Bay Road Reconstruction Page 17 <br />F. ENHANCED LANDSCAPING <br />The base street cost estimates include basic restoration with seed and sod. The following additional <br />streetscape options would allow for landscaping items such as trees, plantings and architectural elements <br />to both enhance the aesthetic appeal of the project and deter pedestrians from crossing the median. The <br />following pages depict and describe three general streetscape options for median and roundabout <br />landscaping. It the project moves forward, they should be used as a general guide when choosing the <br />final landscaping scheme and the associated cost for the landscaping once design has begun. <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 20 of 42]
The URL can be used to link to this page
Your browser does not support the video tag.