My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2010 Council Packet
Orono
>
City Council
>
2010
>
10-25-2010 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2015 10:41:18 AM
Creation date
2/24/2012 10:08:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Orono Project No: 000139-10047-0 <br />Old Crystal Bay Road Reconstruction Page 15 <br />6.1 ADDITIONAL IMPROVEMENT OPTIONS <br />Listed below are several additional roadway improvement options that may be included as part of this <br />project. The City should determine which of the items, if any, it would like to be included in the project. <br />A cost summary of each of these items is included in Section 7.0 (Cost Analysis). Cost estimates for each <br />of these additional improvements options are provided in the Appendix. <br />A. ADDITIONAL ROUNDABOUT <br />We have included a cost estimate to add an additional (third) roundabout at the north driveway <br />entrances to the Middle School and High School. This intersection provides full access for the Middle <br />School and High School bus circulation routes as well as access to two parking lots. A signed and marked <br />crosswalk is also located here. This optional roundabout would improve circulation and safety through <br />the intersection. See Figure 6 for the location of this additional roundabout. <br />B. CITY HALL PARKING LOT IMPROVEMENTS <br />The City Hall parking lot is currently in poor condition, mainly due to poor drainage. Optional <br />improvements to the parking lot include reconstructing the northerly half of the parking lot. See Figure 6 <br />for the location of these improvements. <br />C. WEST SIDEWALK <br />Currently Orono High School students utilitize several parking lots on the west side of Old Crystal Bay <br />Road. However, there is no sidewalk connecting these lots to the High School, creating an unsafe <br />pedestrian environment. Constructing a sidewalk on the west side of the new roadway would provide <br />more favorable conditions for both pedestrians and bikers, and encourage walking and biking to school. <br />This sidewalk would be eight feet wide and constructed of either bituminous or concrete. If this option is <br />chosen, the City should decide if it should be constructed of bituminous or concrete. This optional <br />sidewalk would be located primarily on School District property adjacent to the existing right-of-way. <br />The proposed location of this sidewalk is shown in Figures 5 and 6. <br />D. ENHANCED PEDESTRIAN CROSSINGS <br />The base cost estimate includes implementing zebra-striped crosswalks and standard pedestrian crossing <br />signage at each intersection. However, there are several other features that can be implemented at <br />crosswalks to increase pedestrian safety by attracting more attention to the pedestrian crossings. This <br />report includes three optional improvements that may be used in conjunction with the basic zebra <br />crosswalk and signage. More than one option may be chosen. <br />Option A: In-Street Pedestrian Signs <br />These signs can be placed in the roadway <br />at crosswalks to provide extra emphasis to <br />the crosswalk. <br />Item #10 - CC Agenda - 10/25/2010 <br />Old Crystal Bay Road Reconstruction Feasability Study [Page 18 of 42]
The URL can be used to link to this page
Your browser does not support the video tag.