Laserfiche WebLink
+t __ _- <br /> . ti <br /> � <br /> �� fi� � ',�� ��c. <br /> r���„�:���� � <br /> PROPOSAL- EXHIBI'�i' B <br /> FROM: NEIL kLINGELHUTZ CONSTRUCTION, INC. Date: January l4, ]997 <br /> 9731 Meadowlark Lane <br /> Chanhassen, MN 55317 I <br /> 445-8524 ��� �l �j�r�C�,N� �i� � 1 �k; �Y1�'�n r�:�n �b 3�3 <br /> Proposal submitted to: Work to be performed at: <br /> Name: Jonathan & T'heresa Hofer Street 3339 Crvstal Bay Road <br /> Address: 3339 C . stal Bay Road City: �Y ar�,b �L,,����m„;��.,,,,� �d�1ws5 653`i� <br /> Telephone Number: 991-1119 Plan# 407R-1 as E�chibit A, Proposal as Exhibit B, <br /> Window& exterior door list as Exhibit C, list of <br /> changes from original contract-E�chinit D <br /> We hereby propose to perform all the materials and perform all the labor necessary for the <br /> completion of: <br /> EXTERIOR <br /> Tear down garage structure and rebuild on existing foundation - existing 16 x 7 steel garage door <br /> to be reused with new 1/3 hp opener with 2 controls & keypad. Add l 8' x l9'6"addition above <br /> garage, size and material as specified on print. Replace exterior windows and doors as speci�ed <br /> on list (Exhibit B). NOTE: Uptional basement window with well not included. <br /> Boxed ti�indow added to dining room and jo� in front wall filled in, th� front and sides as sho«m on <br /> print will be covered with Stucco. Stucco shall be three coat work over l6 gauge metal lath. The <br /> dash coat shall be selected as to color and kind by the Owner. Install waterproof paper on <br /> sheathing under the metal. All work to be done in a neat and workmanlike manner. All materials to <br /> be of standard grade or better. 1'he existing siding on the house shall be removed by 4WNER. <br /> Contractor shall cover sheathing with typar house wrap and new Heartland D4 vinyl siding will be <br /> installed. Aluminum soffit and facia to be installed on both new and existing house except existing <br /> soffit will remain on rear of and back half of upper section (left side). Shingles will be re�Y�oved on <br /> the front of house and covered along vvith the addition with a Ceertainteed Horizon sl�angle (color <br /> to be selected by OWNER) Existing shingles shall remain on rear of house.. <br /> NOTE: No material or labor is included in this contract far repair or replacement of existing <br /> roof sheathing or rafters. If work is rec�uired, it will be done on a time and material basis. <br /> New steps and landing up to entry will be constructed of 3 treated 2'x 12" stringers, 2" x 6" <br /> cedar trends and cedar railing. <br /> TRIM <br /> Interior doors to be 6 panel Masonite with veneer birch jams, trim to be 3 1/2"paint�,�rade (C-2) <br /> Princeton Design, base to be paint grade 4 1/4" - doors, base and window casing to be installed <br /> on entire main level. <br />