Laserfiche WebLink
i . � <br /> e accumu a . T <br /> preve , �e�fa�Terra- <br /> Lift . en�he <br /> .r , �-8�8- .. <br /> - anno e guaranteed. if the p ugging o e roc e was caus��-by� <br /> cumu ating in the rock b�ed��rom no�mping�e-�ar�ks-xegularly, the�111uIti-Flo, <br /> s . � �disposed nf, <br /> , �cove� r�t�ien�e c ci�bed wouTd need�ot�� <br /> . - , The rock bed & 6" of soil below the rock bed will <br /> need to be removed & replaced to elevation 89.8 & replace the rock bed, distribution <br /> pipes, sandy loam cap 8� topsoil. <br /> Prior to working on the mound, the vegetation must be mowed off approximately 4" tall. <br /> The exi�ting 1st 1300 gallon tank will be used as a trash trap. The 2nd 1300 gallon <br /> tank will pump (pump #1) to the Multi-Flo Unit using a timer & pumping 15.6 gallons <br /> every 30 minutes using 9' of head pressure at 25 gal/min. Pump #1 must be set on the <br /> bottom of the tank, no block below the pump. The effluent will flow gravity from the <br /> Multi-Flo Unit to the existing 1300 gallon pumping chamber (pump #2) which will pump <br /> to the mound system 6 times/day at 125 gal/cycle. <br /> The soil around the existing tanks must be reshaped to have the manhole covers at the <br /> surface. <br /> Recommend to the check the pumping in the distribution pipes & if salids are found, <br /> clean the distribution pipes with a Jetter. <br /> All property lines are approximate & must be located prior to installation. <br /> All neighboring wells are located greater than 100' away from the proposed treatment <br /> area. <br /> 2 <br />