Laserfiche WebLink
KNAPP RESIDENCE OUTLINE SPECIFICATIONS <br /> SECTION 02140 - DEWATERING <br /> A. PROJECT INCLUDES <br /> 1 . Lowering and controlling groundwater levels during <br /> excavation and construction. <br /> 2 . Control of hydrostatic pressures during excavation and <br /> construction. <br /> 3 . Control of surface and sub-surface water, ice, and snow <br /> related to dewatering. <br /> 4 . Standby equipment for system back-up. <br /> 5 . Establishment and monitoring of observation wells . <br /> 6 . Legal disposal of water removed from excavations . <br /> 7 . Removal of observation wells when no longer required. <br /> B. PRODUCTS <br /> 1 . Dewatering equipment suitable for site conditions . <br /> END OF SECTION <br /> DIVISION 2 - SITE WORK " PAGE 2-2 <br />