Laserfiche WebLink
KNAPP RESIDENCE OUTLINE SPECIFICATIONS <br /> SECTION 02100 - SITE PREPARATION <br /> A. PROJECT INCLUDES <br /> 1 . Protection of existing trees, vegetation, landscaping <br /> materials, and site improvements not scheduled for clearing <br /> which might be damaged by construction activities . <br /> 2 . Trimming of existing trees and vegetation as recommended by <br /> owner for protection during construction activities . <br /> 3 . Clearing and grubbing of stumps, vegetation, debris, <br /> rubbish, designated trees, and site improvements as req' d. <br /> 4 . Topsoil stripping and stockpiling. <br /> 5 . Temporary erosion control, siltation control, and dust <br /> control . <br /> 6 . Removal and legal disposal of cleared materials . <br /> B. PRODUCTS <br /> 1 . Tree protection, erosion control, siltation control, and <br /> dust control materials suitable for site conditions . <br /> END OF SECTION <br /> DIVISION 2 - SITE WORK ' PAGE 2-1 <br />