Laserfiche WebLink
G. DOWNSLOPE BERM WIDTH �'°��- �, �°"�`1' <br /> 1. If landslope is 1% or more, <br /> subtract rock layer width from adsorption width ` ��- =Aq -�'` �i <br /> , xo�x r � h <br /> to obtain minimum downslope berm toe c�,s.,,a ' <br /> -�o ft -1 U ft = �feet ahual Sal � 6:r��u <br /> 2. Calculate Minimum mound Size <br /> a. Determine depth of clean sand fill at u��wam ���W►�� <br /> upslope edge of rock layer: �w�� A�tio„wd�, <br /> Separation 3' - � `� ft = / ? feet <br /> b. Add depth of clean sand for separation (2a) <br /> at upslope edge, depth of rock layer (1 foot)to depth of cover <br /> (1 foot) to find the mound height at the upslope edge of rock layer; <br /> � ft+ lft + lft = 3 � 3 feet �� <br /> c. Enter table with landslope and upslope berm , upsio�w�acn . � <br /> ratio. Select berm multiplier of 3 y� : <br /> d. Multi 1 berm multi lier b u slo e mound `�uP�'''�d�' �°��'-=�;�'{ R°`�`�o 'Q':�:bo"�; ':Upslope Width <br /> P Y P Y P P �� b..�� ��� �d�, � ?Q.���a��,� �_ <br /> height to find upslope berm width: � a;°Q`�:°'�;:� ���°'�;"va;�; . <br /> s <br /> 2 � X � � ; _ � i feet � l ��: �_ r � <br /> e. Multiply rock layer width by � ` <br /> � : <br /> , <br /> landslope to determine drop in elevation; �° ; " ° �o�wld�, 1� ` " � <br /> x �� %+ 100 = � �� feet ,���n w�a�,�_ . <br /> _ _ <br /> :.,: <br /> f. Add depth of clean sand for slope � � �` <br /> To���n�� <br /> difference (2e)at downslope edge, to <br /> the mound height at the upslope edge <br /> of rock layer (2b) to find the downslope height; <br /> 3� � ft + � ft = ����feet <br /> g. Enter table with landslope and downslope berm ratio. Select <br /> berm multiplier of y��� <br /> h. Multiply berm multiplier by downslope mound height to get <br /> downslope berm width: <br /> � �� x '-' �� - /� feet B�si.orE Mvc.�.�xxs <br /> i. Compare the values of step G.1 /� <br /> and Step G.2h�_ LiOd ���r�� n��r� <br /> Select the greater of the two values as the +�� ��� n«m��� <br /> downslope berm width; / 7 feet <br /> j. Total mound width is the sum of � � s� � � � °� 5� � ': � <br /> upslope berm (G.2d) 0 3.o a.o s.o b.o �.o s.o a.o s.o 6.0 �.o s.o <br /> 1 3.09 4.17 5.26 6.38 7.53 2.91 3.85 4.76 5.66 6.54 7.4I <br /> width plus rock layer width (D.2) 2 3.19 a.3s s.sb b.sz s.ia Z.s3 3.�o a.sa 5.36 6.ia 6.90 <br /> plus downslope berm width(G.21�; 3 3.30 4.54 5.88 7.32 8.86 2.75 3.57 4.35 5.08 5.79 6.45 <br /> ,�_ft +�L ft+ �ft= �feet a 3.ai a.� 6.0 �.s9 9.�z z.ba .as a.i� a.sa s.ab b.ob <br /> �C. Total mound length is the sum of upslope s 3.53 5.00 6.67 8.57 10.17 2.61 3.33 4.00 4.62 S.19 5.7t <br /> berm width (G.2d)plus rock layer length(D.3) 6 3.66 s.� �.ia 9.38 �z.m z.sa s.z� 3.ss a.a� 4.93 s.ai <br /> plus upslope berm width (G.2d); � 3.so s.s6 �.� �o.�a 13.73 z.aa 3.�i s.�o a.2s a.�o s.�s <br /> t�°� �� ft + !;3 ft + �ft= �s feet 8 3.95 s.ss 8.33 �i.sa is.9i z.az s.o3 ss� a.os a.a9 a.sa <br /> ��,�� -S �3 /S � 3 9 4.1 I 6.25 9.09 I3.04 18.92 2.36 2.94 3.45 3.90 a.30 4.65 <br /> 10 4.29 6.67 10.00 IS.00 23.33 231 2.86 333 3.75 a.12 4.44 <br /> Final Dimensions. �1 4.48 7.14 ll.li 17.65 30.43 2.26 2.78 3.23 3.61 3.95 4.26 <br /> 12 4.69 7.69 12.30 21.43 43.75 2.21 2.70 3.12 3.49 3.80 4.08 <br /> ,., ��. �( N� <br /> ,�. <br />