Laserfiche WebLink
Melanie Curtis <br /> From: Melanie Curtis <br /> Sent: Wednesday, May 18, 2011 4:01 PM <br /> To: Steve Licht <br /> Cc: 'John Sonnek'; Darren Amundsen <br /> Subject: 2011-00318 for 115 Creek Ridge Pass <br /> Attachments: Escrow Agreement-2011-00318.pdf; 2011-00318 115 Creek Ridge Pass 5-18-11.pdf <br /> Steve <br /> Attached is an escrow agreement form. The escrow for this project is $2,500. Additionally attached are comments from <br /> our engineer on the plans for 115 Creek Ridge Pass. Additionally I have completed my review. It all appears to be in <br /> order with the exception of the number of stories calculation/basement definition. <br /> By my assessment the basement is defined as a story. Therefore the home as proposed is defined as a 3-story home <br /> where two and �/z stories is our limit. As noted on our building height info sheet: In order for the basement or lowest <br /> level to be considered a basement the elevation of the floor above it must be no more than six feet above existing grade <br /> for at least 50 percent of the perimeter of the basement. <br /> I measured the first floor elevation at 963.5'. Over 50% of the perimeter of the structure must be at or below 957.5' <br /> (existing). Your current plan does not accomplish this. Please revise. <br /> Please let me know if you have any questions on my email or the attached. Please note, engineered designs for the <br /> retaining wall will be required prior to the issuance of the permit. <br /> Melanie <br /> Melanie Curtis <br /> Planning &Zoning Coordinator <br /> City of Orono <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> Direct Dial: 952.249.4627 <br /> Fax: 952.249.4616 <br /> Planning &Zoning Office 952.249.4620 <br /> Email: mcurtisCcDci.orono.mn.us <br /> Website: www.ci.orono.mn.us <br /> 1 <br />