Laserfiche WebLink
n�e Curtis <br /> om: Steve Licht(slicht@charlescudd.com] <br /> ent: Thursday, May 19, 2011 1:39 PM <br /> o: Melanie Curtis <br /> Subject: RE: 2011-00318 for 115 Creek Ridge Pass <br /> Attachments: 11129hs Cert 5-19-11.pdf <br /> Melanie, _ - - _ _ _ <br /> - <br /> � __.-.__s - _ <br /> �.__�.__.. _ _ _� <br /> ttached is a revised survey for 115 Creek Ridge Pass. � <br /> he revised elevations are:Top of poured foundation wall =959.2' <br /> �, Top of garage slab @ overhead door= 960.0' �'� <br /> Top of basement floor= 949.5' <br /> Top of first floor= 960.5' <br /> ; <br /> The first floor elevation is 960.5'. Less 6'-0" per the city ordinance = 954.5' ^; <br /> 7his will give us 97.19 lin. feet (50.02%) above the 954.5 contour and 96.39 lin.feet (49.98%) below�the 954.5 contour. <br /> I will drop off hard copies of this with a check and the escrow agreement, <br /> �just wanted to explain to you how we did the calculations. � <br /> J _ —_-�` <br /> �teve Licht - <br /> �.�__...�-__— ----- - - <br /> Sen�rDt�ft r�an � <br /> Charles Cudd DeNovo <br /> From: Melanie Curtis jmailto:MCurtis@ci.orono.mn.usl <br /> Sent: Wednesday, May 18, 2011 4:01 PM <br /> To: Steve Licht <br /> Cc: John Sonnek; Darren Amundsen <br /> Subject: 2011-00318 for 115 Creek Ridge Pass <br /> Steve <br /> Attached is an escrow agreement form. The escrow for this project is $2,500. Additionally attached are comments from <br /> our engineer on the plans for 115 Creek Ridge Pass. Additionally I have completed my review. It all appears to be in <br /> order with the exception of the number of stories calculation/basement definition. <br /> By my assessment the basement is defined as a story. Therefore the home as proposed is defined as a 3-story home <br /> where two and �/z stories is our limit. As noted on our building height info sheet: In order for the basement or lowest <br /> level to be considered a basement the elevation of the floor above it must be no more than six feet above existing grade <br /> for at least 50 percent of the perimeter of the basement. <br /> I measured the first floor elevation at 963.5'. Over 50% of the perimeter of the structure must be at or below 957.5' <br /> (existing). Your current plan does not accomplish this. Please revise. <br /> Please let me know if you have any questions on my email or the attached. Please note, engineered designs for the <br /> retaining wall will be required prior to the issuance of the permit. <br /> Melanie <br /> Melanie Curtis <br /> Planning &Zoning Coordinator <br /> City of Orono <br /> 2750 Kelley Parkway <br /> 1 <br />