My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-008030 - new residence
Orono
>
Property Files
>
Street Address
>
C
>
Cox Farm Road
>
945 Cox Farm Road - 27-118-23-33-0015
>
Permits/Inspections
>
1996-008030 - new residence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:20:58 PM
Creation date
5/11/2016 1:37:54 PM
Metadata
Fields
Template:
x Address Old
House Number
945
Street Name
Cox Farm
Street Type
Road
Address
945 Cox Farm Road
Document Type
Permits/Inspections
PIN
2711823330015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANFORD RESIDENCE <br /> PRELIMINARY PROJECT DESCRIP'TION <br /> F,L.EMENT A - C�ENERAi, <br /> A. GOALS <br /> 1. Provide a barrier free environment. <br /> 2. Offer indoor environments that pay heed to air quality, natural lighting, <br /> acoustics, and special aesthetics. <br /> 3. Minimize construction waste and domestic waste. <br /> 4. Take maximum advantage of environmentally benign materials. <br /> 5. Wheelchair accessibility throughout the entire house and site. <br /> 6. Use indigenous materials where possible. <br /> B. LOT LOCATION <br /> 1. Approximately two acres in Orono, Minnesota. <br /> 2. Lot 3, Block 2, Shadowood Farm, Hennepin County, Minnesota. <br /> 3. Survey by Coffin & Gronberg, Long Lake. <br /> C. STRUCTLTRE <br /> 1. Wood frame house with 2 levels and partial basement. <br /> 2. Detached garage of wood stud and wood truss construction with connection to <br /> house. <br /> 3. House with approximately 3,300 S.F. of living space. <br /> D. SCHEDULE <br /> l. Clearing will be late February, 1996. <br /> 2. Construction to begin on or about May 1, 1996. <br /> 3. Construction to be completed by September 15, 1996. <br /> 4. After completion with all systems operating there will be a one month period to <br /> allow the building and its materials to out-gas. Availability for use: October 15, <br /> 1996. <br /> E. GENERAL <br /> 1. No smoking will be allowed in the building during construction. <br /> 2. The use of recycled building materials is encouraged. <br /> 3. Dispose of material through recycling and reuse. <br />
The URL can be used to link to this page
Your browser does not support the video tag.