Laserfiche WebLink
U All fire stops are air sealed. <br /> U Pipes,ducts,wires,equipment and flues and chimneys lhrough the interior air barrier are sealed. <br /> U A sealed continuous interior air barrier is instailed on the wan7i side of the building envelope at ceilings,walls,and floor rim joist <br /> areas". <br /> U Air barrier behind tub and shower is sealed and protected. <br /> U Recessed light fixtures are sealed. <br /> Envelope Insulation: <br /> U Basement insulation R-5 minimum. <br /> U Wind wash barrier on wall separating house and garage is sealed. <br /> U Loose fill insulation is prevented from entering the eaves. <br /> U Insulalion on skylight shafts and walls exposed in atlics is supported on the unconditioned side. <br /> Attic Insulation: <br /> U Attic access panel insulated to R-38 for ceiling panel and R-19 for wail panel. <br /> U Attic card attached to framing near access opening. <br /> U Notification of attic R-value and date of installation posted near building permit inspeci:ion card. <br /> This is a summary only.Other requirements may apply.See the Minnesota Ener,yy Code. Questions?Call the Department of Public <br /> Service Information Center at 651-296-5175 or 1-800-657-3710. <br /> _ . <br /> SroneBay of Orono 2000 S:F. Twin Home _ __ _ <br /> Page 3 of 3 <br />