Laserfiche WebLink
REScheck Software Ver�ion �.1.0 <br /> RESch�ck Inspee��iar� Checklist <br /> Date: 01/28/08 <br /> Plan Review and Inspection Issue�s <br /> This list of items may be helpful for Plan Reviewers and Building Inspectors to use as a guide for enforcing the Minnesota Energy Code. <br /> The items apply to Group R, Division 3 Occupancies,one-and two-family residential dwellings.The i(ems marked with*apply only lo <br /> detached one-and two-family residential dwellings. <br /> Plan Review Issues <br /> Foundation Inspection: <br /> U Foundation wall insulation R-5 minimum. <br /> U Foundation insulation extends from top of wall down to top of the footing. <br /> J Exterior foundation insulation is covered by a prolective coating finish. <br /> Concrete Slab or Under-Slab Inspection: <br /> U Slab on grade perimeter insulation R-5 minimum. <br /> (J Slab insulation extends from top of slab to design frost line or lop of footing. <br /> U Floors over unheated space R-30 minimum. <br /> Windows/Doors!Skylights: <br /> U Average U-value is 0.37 maximum for windows and Glass doors(exdudes foundation windows). <br /> U Window U-values consistent with building plan and RESchecl<Certificate. <br /> �] Window and door areas consistent with building plan and REScheck Certificate. <br /> Mechanical Ventilation fssues: <br /> U Residential mechanical ventilation system provides adequate ventilation per cade requirernents'. <br /> U Furnace efficiency is consistent with REScheck Certificate or building plan. <br /> U Protection againsi excessive depressurization is installed per code requirements*. <br /> Envelope Insulation for Plan Review: <br /> � Interior basement insulation R-5 minimum(if no exterior insulation). <br /> U Ceilings with attics R-38 minimum or consistent wilh building plan and REScheck Certificale. <br /> �] Wall framing and insulation level is consis(ent with buildiny design��nd REScheck Certificate. <br /> Inspection Issues <br /> Concealed Insulation <br /> Framing and Sheathing: <br /> U Wind wash barrier installed at attic edge. <br /> U Exterior wall corners framed so that insulation can be installed afler exterior sheathing is installed. <br /> U Intersections of interior partition walls and exterior walls framed so that insulation can be instal�ed belween the partition and <br /> exterior sheathing after exterior sheathing is installed. <br /> U Gaps between framing less than one-half inch are eliminated by securing framiny together or are insulated at the time of assembly <br /> U All penetrations between conditioned and unconditioned spaces made prior to frarning inspection are sealed*. <br /> Interior Air Barrier: <br /> StoneBay of Orono 2000 S.F. Twin Home - _ <br /> Page 2 of 3 <br />