My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00798 - COO with Permit info
Orono
>
Property Files
>
Street Address
>
C
>
Cobblestone Court
>
2460 Cobblestone Court - 33-118-23-11-0081
>
Permits/Inspections
>
2015-00798 - COO with Permit info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:44:32 PM
Creation date
4/20/2016 10:35:51 AM
Metadata
Fields
Template:
x Address Old
House Number
2460
Street Name
Cobblestone
Street Type
Court
Address
2460 Cobblestone Court
Document Type
Permits/Inspections
PIN
3311823110081
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��•--�.��-��,��' <br /> r � ;� <br /> . � Erosion Control Supplemental Information <br /> Y ._:_,, _. _ _ -�_,,,��J <br /> Final Stabilization will be provided with (seed, sod, etc): _�� � ` <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout: Location of concrete washout <br /> �Off site _Indicated on site plans _Other(description): _Contained on truck: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater, of all vegetation to be retained. <br /> �Yes _Not Applicable _Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects disturbing'/4 acre or <br /> greater. The inspection requirements are as follows: <br /> I) The individual idenrified as being responsible for implementing the erosion control <br /> plan must routinely inspect the construction site once every seven days during active <br /> construction and within 24 hours after a rainfall event greater than 0.S inches in 24 <br /> hours. <br /> 2) All inspections and maintenance conducted during construction must be recorded in <br /> writing and these records must be retained with the erosion control plan and made <br /> available at the District's reguest within 24 hours. Records of each inspection and <br /> maintenance activity shall include: <br /> i. Date and time of inspections; <br /> ii. Name ofperson conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates, times and party completing <br /> maintenance activities); and <br /> v. Date and amount of all rainfall events greater than 0.S inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name �, r�,��,� <br /> Organization���1�Q�g�(,j��j 'p1�.Xi <br /> Phone QS,�3�5' ��L{3 Alternate Phone �1�_ a�-� q <br /> Email �E1M.��c���„!�"_��'d,(�,5. C�(Yy�/�� <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> . <br /> C(t , <br /> Signature of Applicant or Authorized Agent Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.