Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, March 28, 2016 <br />7:00 o'clock p.m. <br />7. #16-3807 TOM GONYEA, ESTATE DEVELOPMENT CORPORATION, 425-595 OLD <br />CRYSTAL BAY ROAD NORTH, PRELIMINARY PLAT APPROVAL — DRAFT RESOLUTION <br />AND COMPREHENSIVE PLAN AMENDMENT, PRELIMINARY PLAT APPROVAL, <br />RESOLUTION NO. 6599 (continued) <br />Gonyea stated it could also potentially shrink the elevation. <br />City Administrator Loftus asked how many potential units could be constructed on the Dumas and <br />Eisenger properties. <br />Gaffron stated for the Eisenger property, they are looking at 27 units with the potential for a multi -family <br />building. The Dumas property is guided for seven to ten units per acre, with the potential for as many as <br />150 units. <br />Loftus questioned if the residents on the corner would be okay with pedestrians from 175 units passing <br />by. <br />Gonyea indicated in other cities, such as Maple Grove, they have designated trails, which would be the <br />situation here. Gonyea stated how heavily traveled it is would be up in the air. <br />Printup stated given the future development of the Eisenger and Dumas properties, that is exactly why the <br />City should obtain an easement on this property. Printup stated another issue that is not fully known at <br />this time is if there are wetlands on those properties and how they will be navigated. Printup stated <br />having a trail along a road where the speed limit is 50 miles an hour is a concern, but the City should have <br />an easement to help plan for the future developments. <br />McMillan stated the turnback committee talked about the trail going all the way down to Highway 6 but <br />that there are some wetlands that would make that difficult. In addition, the school wanted that <br />connection to their back trail. Hennepin County indicated they were okay with the trail going on the <br />north side. McMillan stated she is not sure if they should require a trail on the south side as well. <br />Loftus stated cost -wise now would be the best time to do it. <br />McMillan asked when a decision would be required on the easement. <br />Gaffron stated that is something that needs to be decided in the near future so it can be included in the <br />preliminary plat approval resolution. <br />.McMillan asked if they will be shrinking that road or whether it will be made wider. <br />Loftus indicated she does not believe it will change significantly. <br />Gonyea noted the County has quite a bit of right-of-way in that area and that there are some <br />improvements along that road that are being considered. Gonyea stated right now there is a lot of excess <br />right-of-way there and that it might make sense to approach Hennepin County to ask for a 10 -foot trail <br />along the edge of the road. <br />Levang stated she prefers that option since it would give those homeowners more privacy. Levang asked <br />how much feet belongs to the County. <br />Page 10 of 17 <br />