My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P10689 - office remodel
Orono
>
Property Files
>
Street Address
>
B
>
Blaine Avenue
>
2389 Blaine Avenue - 17-117-23-34-0012
>
Permits/Inspections
>
2007-P10689 - office remodel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:15 PM
Creation date
4/18/2016 2:26:43 PM
Metadata
Fields
Template:
x Address Old
House Number
2389
Street Name
Blaine
Street Type
Avenue
Address
2389 Blaine Avenue
Document Type
Permits/Inspections
PIN
1711723340012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ' � Revised 12/11/06 <br /> � g) Contractor must provide Floor Scouts with a materials takeoff(fax-314-997-3974)or coordinate <br /> wlth Floor Scouts direcUy for instatlation.Allow 2 to 3 weelts for deliverv of materials. <br /> . � h) InstallaGon method fw ca�pet�drrect glue, Floor prep is the responsibility of contractvr. In cases <br /> of severe floor prep, provide cost for pad, if sufficient far making floor level. <br /> i) See manufacture's instructions for post-instaliationJclean;ng instructions. <br /> 6. HVAC <br /> a) HVAC system should be able to maintain 75 degree summer and 70 degree winter temperatures <br /> in accordance with the ASNRAE design standards applicable to this location. If necessary, a <br /> formal inspection to verify equipment condition can be done. <br /> b) System to be fully operational, in good condition and propeny balanced upon completion of work. <br /> Please make sure the thermostat is located in an occupied area of the space as shown on iloor <br /> plan(typically in room 101 or 103) <br /> c) For all new and re-model projects, install a new White-Rodgers 7-day programmable thermostat. <br /> Provide appropriate stat for unit slze and type. Set stat for M-F 8-5 hours of aperation. Leave <br /> instructions taped to stat for futu�e reference. <br /> d) All diffusers, c,�illes,and thermostats shall be clean, in good condition and properly functioning. <br /> Location to be revised as necessary per new parti6on layout_ <br /> e) lf space is being subdivided, Edward Jones space to be separate�y corrtrolled—sharing of <br /> thermostat with adjacent spaces is not acceptable. <br /> � Edward Jones BOC(location noted on Exhibit A)�equires ve�Matian.Acceptable methods are: <br /> 1. Add a supply/return duct o�grill to the room <br /> 2. Undercut the door to the room 1" <br /> 7. FIXED WINDOW(Only if shown on Exhibit A) <br /> a) New interior window between IR off'ice and BOA area to be a fixed, 42"w x 30'h and installed at <br /> 42"AFF(unless Exhibit A�otes differenUy). <br /> b) If inetal frame is used, trim to be paintad to match new watl cvlor in which the window is placed. <br /> c) If wood trim is used, match to surrounding wall color or new doorlframe color. <br /> d) Glass to be dear, '/."tempered. <br /> 8. PLUMBING/RESTROOM <br /> a) Lavatory sink(s), if any, to have hot and cotd-water service. I�ata-hot Is NOT acceptable. If <br /> unabJe to install water heater above ceding,contact designer at 800-824-6525,ASAP for direction. <br /> b) Please adhere to any local, state,o�national codes, which might require modiflcation of existing <br /> resVoom. <br /> c} Resiroom fixtures to be in good condition(i.e. in good operation and free of stains or cracks).The <br /> �estroom is to have a mirror, paper towel dispenser or towel rack, and toitet paper holder. Ptease <br /> verify that these items exist or provide cost of new accessories and installation of such. <br /> 9.CEILING <br /> a) Ceilings should be free from stains and dirt. <br /> b) Acoustical Ceilings-tiles should be free from chips and kxeaks.All tiles should be the same color <br /> and style.The grid should be even,free from holes(or fiUed), and should be clean.Tiles should be <br /> a standard c�mmercial grade acoustical tile. Contiguous area must have matching tile. <br /> c) Installation of ceiling grid and component to comply with all Iocal codes for renovation or new <br /> installations. <br /> d) Drywall Ceilings-Should be level, have an even texture, and should be painted white(See paint <br /> spec). <br /> i, i <br /> ,�; <br /> I i I <br /> i�:: � � <br /> 4 <br /> '�i ' <br /> �� <br /> ,�,; '' <br /> ;, <br /> Il�u � , <br />
The URL can be used to link to this page
Your browser does not support the video tag.