r . ..
<br /> � '
<br /> 7. Swivel the mined by the I chamber and j
<br /> chamber on the preference of ""'�--��� All-in-One `t` �
<br /> pin to achieve �`' - � the installer " � Endcap to �:- r`�1
<br /> the proper direc- s� •. ' designer. accommodate �,�= } ';3�. ;R�`
<br /> �
<br /> tion for trench �,,�' �,� ��"',„ �u,4� 2.With a h� 4-inch Schedul ' F ;t,, , � `
<br /> layout. ' saw, drill a :, 40 pipe. Drill ';:` `'
<br /> NOTE:The t �` ���' �; � 4Yz-inch ope�,� � a 2'/z-inch I ���'� ,��
<br /> chamber allows .F" on the end of �, opening on the
<br /> up to 10-degree ;�y` ����� =� ��`� the Quick4 Plus �,o,ii F:��..,�, .� , ;e or to�. Quick4 Plus
<br /> swivel in either l. /�'�, �d� All-in-One 12 Standard
<br /> direction at � Endcap to cre- , chamber to
<br /> each joint. ate an invert at accommodate a
<br /> 8. Continue connecting chambers until the 0.5 inches. Th�s a„��"='-" 2-inch Schedule 40 pipe.
<br /> trench is completed. will allow efflu , � 2. Set a cut piece of pipe of the appropri-
<br /> NOTE:As chambers are installed, verify ent to fill both - ate length into the corresponding endcap's
<br /> they are level or have the prescribed slope. sides of the �' inspection port sleeve.
<br /> 9.The last , chamber line. .,� 3. Use two screws to fasten the pipe to
<br /> ��` �� '�N � � 3. Snap off the - � the sleeve around the inspection port.
<br /> chamber in the -�.
<br /> �;. .rr-..,.
<br /> trench requires '� :rM.. � `�� � � molded splash 4.Attach a threaded cap or cleanout
<br /> an endcap. Lift ' .- y plate located on 2 o��u endcap on end. assembly onto the protruding pipe at the
<br /> the endcap at a � � the bottom front appropriate height.
<br /> 45-degree angle �, .� �. ., of the endcap. 5.A small valve cover box may be used
<br /> and align the `•'`° ' " ` ; 4. Install splash plate into the appropriate if the inspection port is below the desired
<br /> connector hook ' � slots below the inlet to prevent trench j grade.
<br /> on the top of the ' _.: , bottom erosion. '
<br /> chamber with 9.r�i��A e�d��a�o�,tiet end. 5. Place the back edge of the endcap over ' COVERING THE SYSTEM
<br /> the raised slot the inlet end of the first chamber. Be sure
<br /> on the top of the endcap. Lower the end- to line up the Before backfilling,the system must be
<br /> cap to the ground and into place. locking pins on � , inspected by a health officer or other
<br /> NOTE: Place a few shovels of soil around the top of both � official as required by State and local
<br /> the endcap to secure it during backfill. chamber and codes. Create an as-built drawing at
<br /> 10.To ensure structural stability, fill the endcap. this time for future records.
<br /> sidewall area b ullin soil from the 6. Insert 1. Backfill the trench by pushing fill
<br /> y p g material over the chambers with a back-
<br /> sides of the trench with a shovel. Start at connection pipe
<br /> the oints where the chambers connect. 2•5 inches into -�::,� _� hoe. Keep a minimum of 12 inches of
<br /> -�..:=:_n
<br /> 1 compacted cover over the chambers
<br /> Continue backfillin the entire sidewall opening on 6.Insert connection pipe.
<br /> g endcap. before driving over the system.
<br /> area, making sure the fill covers the lou- NOTE: Do not drive over system while
<br /> vers. backfilling in sand.
<br /> 11. Pack down fill by walking along the INSTALLING INSPECTION PORTS NOTE: For shallow cover applications,
<br /> edges of trench and chambers. Inspection ports may be installed on each you must mound 12 inches of soil over
<br /> NOTE: In wet or clay soils, do not walk in of the chamber tops or on top of the the system before driving over it, and then
<br /> the sidewalls. Quick4 Plus All-in-One �2 Endcap. ; grade it back to 6 inches upon completion.
<br /> 12. Proceed to the next trench and begin Endcap Inspection Port i 2. It is best to mound several inches of
<br /> with Step 1. 1.With a hole saw drill the pre-marked soil over the finish grade to allow for
<br /> area in the top r -;.:;,;": settling. This also ensures that runoff water
<br /> INSTALLING QUICK4 PLUS of the chamber - ��-`V is diverted away from the system.
<br /> ALL-IN-ONE 12 ENDCAPS AS A or endcap to �` � 3.After the system is covered, the site
<br /> create an open �' �' should be seeded or sodded to prevent
<br /> MID-LINE CONNECTION ing based on ��*�` erosion.
<br /> 1.With a hole saw drill an opening appro- Pipe type. �'� � ` ;;`,� NOTE: If the system is for new home
<br /> priate for the pipe diameter being used on NOTE: Drill a �'� �. �`^' construction, it is important to leave
<br /> the side(3.3" invert)or on top (9.0" invert) 4'/z-inch opening `''� marking stakes along the boundary of the
<br /> of endcap. on the Quick4 system.This will show contractors where
<br /> NOTE• Piping configurations are deter- Plus High .�!_;�;;=�x the site is located so they will not cross it
<br /> Capacity �.o��u er,d�ap o�,co�. with equipment or vehicles.
<br /> � 4 Business Park Road Infiltrator Systems,Inc.Limited Warranty
<br /> � P.O.Box 768
<br /> Old Saybrook,CT 06475 Available at:www.infiltratorsystems.com
<br /> I N F I LT R ATO R� ��oo ss�aass�aso-s»-�ooi or call 1-800-221-4436
<br /> systems If1C. www.infiltratorsystems.com
<br /> U.S.Patents:4,759,661;5,017,041;5,156,488;5,336,017;5,401,116;5.401,459;5,511,903;5,716,163;5,588,778;5,839,844 Canadian Patents:1,329,959;2,004.564 Other patents pending.Infiltrator,Equalizer,
<br /> Quick4,and SideWinder are registered trademarks of Infiltrator Systems Inc.Infittrator is a registered trademark in France.Infiltrator Systems Inc.is a registered trademark in Mexico.Contour,MicroLeaching,
<br /> PolyTuft.ChamberSpacec MultiPort PosiLock.QuickCut,OuickPlay.SnapLock and StraightLock are trademarks of Infltrator Systems Inc.PolyLok is a trademark of PolyLok,Inc.TUF-TfTE is a registered
<br /> trademark of TUFTftE.WC.Ultra-Rib is a trademark of IPIX Inc. �O 2013 Infiltrator Systems Inc.Ali nghts reserved.Printed in U.S.A. PLUS09 05131SI
<br /> • • � ' • . • : 11 •
<br />
|