|
M 1 r
<br /> � 1
<br /> Materials and Equipment Needed , ,
<br /> ❑Quick4 Plus chambers ' I � � � � ' ,
<br /> ❑Quick4 Plus All-In-One 12 endcaps
<br /> ❑PVC pipe and couplings � � � � � � � � � � � �
<br /> ❑Backhoe
<br /> ❑Laser,transit or level Quick4 Plus Standard and Quick4 Plus High Capacity chambers may only be installed
<br /> ❑Shovel and rake according to State and/or local regulations. If unsure of the installation requirements
<br /> ❑Tape measure for a particular site,contact the local health department.
<br /> ❑Screwdriver or utility knife
<br /> ❑Hole saw Like conventional systems, the soil and site conditions must be approved prior to
<br /> ❑2-inch drywall screws` installation. Conduct a thorough site evaluation to determine the proper sizing and
<br /> ❑Screw gun' siting of the system before installation.
<br /> ❑Small valve-cover box'
<br /> ❑4-inch cap for Inspection port• Quick4 Plus Standard Quick4 Plus High Capacity
<br /> 'Optional
<br /> � �� �RI
<br /> These guidelines for construction machinery a _ � � �' � � �� �II��3E���lf ��� ������ �������I '���� �� �� �� ���
<br /> must be followed during installation. � I '� I � I I Ir�'�
<br /> ❑Avoid direct contact with chambers when usin = __ , = _ = I I� �� Ij � �LI�.1 ' II��_'���
<br /> 9 ,�..—_ — -_�� —.---I
<br /> construction equipment.Chambers require EFFE�T,�E�ENCT„ �— EFFEor,�E�EN�TH
<br /> a 12-inch minimum of compacted cover to
<br /> support a wheel load rating of 16,000 Ibs/axle or _.
<br /> equivalent to an H-10 AASHTO load rating.
<br /> ,s^
<br /> ❑Only drive across the trenches when necessary. �2" �
<br /> Never drive down the length of the trenches.
<br /> ❑To avoid additional soil compaction,never drive I
<br /> heavy vehicles over the completed system. �" �—�""�i
<br /> .: � -•
<br /> EXCAVATING AND PREPARING on front or side of ' �� the first chamber •.�°�""--. ,� �.. ,a,° �"R
<br /> THE SITE endcap using center • �'� 'r, Be sure to line � �,�;*�,,�
<br /> point marking (see up the locking -
<br /> NOTE:As is the case with conventional illustration) as a guide. ,,, '� pins on the top `" _
<br /> systems,do not install the systems in wet - , of both the �
<br /> conditions or in overly moist soils,as this ��- chamber and s t� -'
<br /> causes machinery to smear the soil. .. ` endcap. ��`.°'
<br /> 1. Stake out location of trenches and lines. � 5. Insert the -. } '��;;�
<br /> Set elevations of the tank, pipe, and trench inlet i e 2.5 4 # �'
<br /> bottom. GIUICK4 PWS ALL-IN- '� inch spnto the " -- - -
<br /> ONE 12 ENDCAP DRILL LOCATIONS: � � �� ~y �`~.
<br /> 2. Install sedimentation and erosion control opening on the ``
<br /> eNooRsioEa•iNveRT roaizriNVEars "'��?'+"4
<br /> measures. Temporary drainage swales/ ,�RA,,,r,N�ETORo�T�ET, �-7�,N�EroRo�.�E., 64 endcap. -
<br /> 4.
<br /> berms may be installed to protect the site 5.=5•�N�ERT 6. Lift and placE: "_ '
<br /> during rainfall events. c����ry�N�ET � the end of the "
<br /> 1"PRESSURE OR OUTLET)
<br /> LATERAL(TVP.) END OR SIDE 0.]5'INVERT '
<br /> 3. Excavate and level 2-foot wide trenches �FORM�a��NE�oNNE�r�o�! next chamber
<br /> 2'PRESSURE OR LOOPED ENDS)
<br /> with proper center-to-center separation. aTE��m�., � onto the previ-
<br /> Verify trenches are level or have pre- ' ous chamber
<br /> scribed slope. 2. Snap off the molded splash plate locat- by holding it ? � �
<br /> ,�, r
<br /> NOTE: Over excavate the trench width in ed on the bottom front of the endcap. , at a 45-degree �.;
<br /> an le. Line u �"' "
<br /> areas where you are planning to contour. 3. Install splash plate into the appropriate 9 p s.co��
<br /> 4. Rake bottom and sides if smearing has slots below inlet to prevent trench bottom the chamber
<br /> occurred while excavating. Remove any erosion. end between
<br /> large stones and other debris. Do not use the connector hook and locking pin at the
<br /> the bucket teeth to rake the trench bottom. �NSTALLING THE SYSTEM top of the first chamber. Lower the cham-
<br /> ber to the ground to
<br /> 5.Verify that each trench is level using a 1,Check the header pipe to be sure it is connect the chambers.
<br /> level,transit, or laser. level or has the prescribed slope.
<br /> NOTE:When the chamber end is placed
<br /> 2. Set the invert he�nht as specified in the between the connector hook and locking
<br /> PREPARING THE QUICK4 PLUS design from the '' pin at a 45-degree angle, the pin will be
<br /> bottom of the �'
<br /> ALL-IN-ONE 12 ENDCAPS inlet. �-�:� .,"�;`� visible from the back side of the chamber.
<br /> NOTE:The C2uick4 Plus All-in-One 12 ; '" NOTE:The connector hook serves as a
<br /> Endca is com atible with the Quick4 Plus 3. Place the first �; y
<br /> p P chamber in the guide to ensure proper connection and
<br /> Standard and Quick4 Plus High Capacity ,. '� does not add structural integrity to
<br /> chambers, and can be used on either end trenc h. 'J`- ;� � chamber joint. Broken hooks will not affect
<br /> of the trench, depending upon the installer's 4. Place the � the structure or void the warranty.
<br /> preference and configuration requirements. back edge of l
<br /> 1. With a hole saw drill a 4Yz-inch opening the endcap over `�"�_.�;
<br /> the inlet end of , �.:��:,:
<br /> a._>,a�E: _ ��
<br /> Contact Infiltrator Systems Inc.1-800-221-4436 for additional technical and product information.
<br />
|