Laserfiche WebLink
M 1 r <br /> � 1 <br /> Materials and Equipment Needed , , <br /> ❑Quick4 Plus chambers ' I � � � � ' , <br /> ❑Quick4 Plus All-In-One 12 endcaps <br /> ❑PVC pipe and couplings � � � � � � � � � � � � <br /> ❑Backhoe <br /> ❑Laser,transit or level Quick4 Plus Standard and Quick4 Plus High Capacity chambers may only be installed <br /> ❑Shovel and rake according to State and/or local regulations. If unsure of the installation requirements <br /> ❑Tape measure for a particular site,contact the local health department. <br /> ❑Screwdriver or utility knife <br /> ❑Hole saw Like conventional systems, the soil and site conditions must be approved prior to <br /> ❑2-inch drywall screws` installation. Conduct a thorough site evaluation to determine the proper sizing and <br /> ❑Screw gun' siting of the system before installation. <br /> ❑Small valve-cover box' <br /> ❑4-inch cap for Inspection port• Quick4 Plus Standard Quick4 Plus High Capacity <br /> 'Optional <br /> � �� �RI <br /> These guidelines for construction machinery a _ � � �' � � �� �II��3E���lf ��� ������ �������I '���� �� �� �� ��� <br /> must be followed during installation. � I '� I � I I Ir�'� <br /> ❑Avoid direct contact with chambers when usin = __ , = _ = I I� �� Ij � �LI�.1 ' II��_'��� <br /> 9 ,�..—_ — -_�� —.---I <br /> construction equipment.Chambers require EFFE�T,�E�ENCT„ �— EFFEor,�E�EN�TH <br /> a 12-inch minimum of compacted cover to <br /> support a wheel load rating of 16,000 Ibs/axle or _. <br /> equivalent to an H-10 AASHTO load rating. <br /> ,s^ <br /> ❑Only drive across the trenches when necessary. �2" � <br /> Never drive down the length of the trenches. <br /> ❑To avoid additional soil compaction,never drive I <br /> heavy vehicles over the completed system. �" �—�""�i <br /> .: � -• <br /> EXCAVATING AND PREPARING on front or side of ' �� the first chamber •.�°�""--. ,� �.. ,a,° �"R <br /> THE SITE endcap using center • �'� 'r, Be sure to line � �,�;*�,,� <br /> point marking (see up the locking - <br /> NOTE:As is the case with conventional illustration) as a guide. ,,, '� pins on the top `" _ <br /> systems,do not install the systems in wet - , of both the � <br /> conditions or in overly moist soils,as this ��- chamber and s t� -' <br /> causes machinery to smear the soil. .. ` endcap. ��`.°' <br /> 1. Stake out location of trenches and lines. � 5. Insert the -. } '��;;� <br /> Set elevations of the tank, pipe, and trench inlet i e 2.5 4 # �' <br /> bottom. GIUICK4 PWS ALL-IN- '� inch spnto the " -- - - <br /> ONE 12 ENDCAP DRILL LOCATIONS: � � �� ~y �`~. <br /> 2. Install sedimentation and erosion control opening on the `` <br /> eNooRsioEa•iNveRT roaizriNVEars "'��?'+"4 <br /> measures. Temporary drainage swales/ ,�RA,,,r,N�ETORo�T�ET, �-7�,N�EroRo�.�E., 64 endcap. - <br /> 4. <br /> berms may be installed to protect the site 5.=5•�N�ERT 6. Lift and placE: "_ ' <br /> during rainfall events. c����ry�N�ET � the end of the " <br /> 1"PRESSURE OR OUTLET) <br /> LATERAL(TVP.) END OR SIDE 0.]5'INVERT ' <br /> 3. Excavate and level 2-foot wide trenches �FORM�a��NE�oNNE�r�o�! next chamber <br /> 2'PRESSURE OR LOOPED ENDS) <br /> with proper center-to-center separation. aTE��m�., � onto the previ- <br /> Verify trenches are level or have pre- ' ous chamber <br /> scribed slope. 2. Snap off the molded splash plate locat- by holding it ? � � <br /> ,�, r <br /> NOTE: Over excavate the trench width in ed on the bottom front of the endcap. , at a 45-degree �.; <br /> an le. Line u �"' " <br /> areas where you are planning to contour. 3. Install splash plate into the appropriate 9 p s.co�� <br /> 4. Rake bottom and sides if smearing has slots below inlet to prevent trench bottom the chamber <br /> occurred while excavating. Remove any erosion. end between <br /> large stones and other debris. Do not use the connector hook and locking pin at the <br /> the bucket teeth to rake the trench bottom. �NSTALLING THE SYSTEM top of the first chamber. Lower the cham- <br /> ber to the ground to <br /> 5.Verify that each trench is level using a 1,Check the header pipe to be sure it is connect the chambers. <br /> level,transit, or laser. level or has the prescribed slope. <br /> NOTE:When the chamber end is placed <br /> 2. Set the invert he�nht as specified in the between the connector hook and locking <br /> PREPARING THE QUICK4 PLUS design from the '' pin at a 45-degree angle, the pin will be <br /> bottom of the �' <br /> ALL-IN-ONE 12 ENDCAPS inlet. �-�:� .,"�;`� visible from the back side of the chamber. <br /> NOTE:The C2uick4 Plus All-in-One 12 ; '" NOTE:The connector hook serves as a <br /> Endca is com atible with the Quick4 Plus 3. Place the first �; y <br /> p P chamber in the guide to ensure proper connection and <br /> Standard and Quick4 Plus High Capacity ,. '� does not add structural integrity to <br /> chambers, and can be used on either end trenc h. 'J`- ;� � chamber joint. Broken hooks will not affect <br /> of the trench, depending upon the installer's 4. Place the � the structure or void the warranty. <br /> preference and configuration requirements. back edge of l <br /> 1. With a hole saw drill a 4Yz-inch opening the endcap over `�"�_.�; <br /> the inlet end of , �.:��:,: <br /> a._>,a�E: _ �� <br /> Contact Infiltrator Systems Inc.1-800-221-4436 for additional technical and product information. <br />