My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06826 - septic
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
180 Big Island - PID: 23-117-23-23-0036
>
Septic
>
2003-P06826 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:12:55 PM
Creation date
4/18/2016 1:13:22 PM
Metadata
Fields
Template:
x Address Old
House Number
180
Street Name
Big Island
Address
180 Big Island
Document Type
Septic
PIN
2311723230036
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> ' • Screened Pump Vault — Orenco Systems, Inc. model #PVL157-1819 pump vault in the lift tank <br /> through the maintenance hole (see figure in Appendix D). Orenco Systems, Inc. modified well pump <br /> ' model # P200511, 115V, '/z hp, (or equivalent) in the flow inducer of the pump vault. Connect a <br /> schedule 40 PVC discharge pipe to pump and extend discharge pipe through riser wall. Install a <br /> camlock on the discharge pipe between pump and the riser for easy disconnect. Drill a 3/16" weep hole <br /> ' at the invert of the 90 degree bend in the discharge pipe to allow drain back. Inst�ll all high-pressure <br /> fittings. <br /> ' • Drain Field—Excavate the drain field bed area as depicted on Figure 2. Depth of;excavation shall be <br /> 98.8 and level. Place 6 inches of clean sewer rock across the bottom of bed area. Place perforated <br /> lateral network over the rock-bed (see design worksheets for size of piping, orifice sizing and spacing. <br /> ' Cover laterals with an additional 2" of clean sewer rock, cover rock with geotextile fabric. Back fill <br /> with sandy loam soil and seed for cover. <br /> ' 7. Limitations - Our investigation, layout, design, and recommendations are based on data submitted. <br /> If conditions considerably different from those described in this report are encountered, we must be <br /> notified. If proposed construction is changed, we must be notified to evaluate the effect of the changes <br /> ' on the wastewater system. Any changes to the design must be approved by the designer and will be <br /> assessed additional design costs. If changes are made to the design without the knovyledge and approval <br /> ' of the designer the design shall be void. All construction is to be in accordance with the ISTS <br /> regulations. Pipe type and size, installation requirements, septic tank construction, and other <br /> specifications not depicted in our report are to conform to ISTS regulations. The installer of the system <br /> ' is to be licensed by the Minnesota Pollution Control Agency. <br /> If you have questions, please feel free to call. _ <br /> ' Sincerely, <br /> ' <br /> Peter G. Miller <br /> ' Soil Scientist, Designer I MPCA Certification#2341 <br /> Eco Systems Engineering MPCA Certification#208 <br /> ' <br /> ' <br /> ' <br /> ' <br /> ' <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.