Laserfiche WebLink
' <br /> ' Borin #1 and #2 indicates the site is underlain b hi h chroma loam <br /> g y g and sandy clay loam soils to <br /> approximately 3 feet. The parent material for the area, high chroma loam soils with many threads of <br /> ' calcium carbonates (often misidentified as low chroma iron reductions), was found to the depth of the <br /> borings. Many fine gray shale fragments were observed in the profile along with gray calcium <br /> carbonates and reddish iron concretions. These soil features are a result of the soil parent material not a <br /> ' fluctuating seasonal water table. <br /> The landscape position, soil parent material, elevation above known water table and the results of the <br /> ' soil investigation dictate that the site can support a sta.ndard subsurface drain field. ; The results of <br /> percolation tests, soil structure analysis and soil te�ure analysis lead to the selection of a soil sizing <br /> factor for this type of soil of 2.20 square feet per gallon. <br /> ' 4. Sizin of Tr - <br /> g eatment S s�— The OWS is designed for a two bedroom home. The estimated daily <br /> , flow for a two-bedroom home is 300 gallons. Sink and toilet fixtures need to be monitored closely to <br /> ensure proper operation. A leaking facet or toilets can more than double the daily flow to the OWS and <br /> cause hydraulic failure. <br /> ' S. Description of the Treatment Process— <br /> ' • Primary Treatment - Sewage is gravity discharged from the house to a septic, tank. Natural <br /> biological activities taking place inside of the septic tank will separate solids and suspended particles. <br /> Solids are reduced to some extent through this process. <br /> ' • Secondary Treatment—Effluent fram the clear zone of the sepric tank flows into a lift tank. Inside <br /> of the lift tank will be installed an Orenco Systems, Inc. Biotube pump vault and modified well pump. <br /> ' Suspended particles larger than 1/8"are filter out by the Biotube pump vault. <br /> • Final Treatment — Effluent is pumped to a new 660 square foot drain field. As the effluent trickles <br /> ' down into the soil biochemical processes remove harmful viruses and bacteria. <br /> 6. Description of Treatment S sy tem—(See figure, design sheets and data sheets for additional detail.) <br /> ' • Septic/Lift Tank — 1,500 gallon two compartment fiberglass septic tank. First compartment, 1,000 <br /> gallons, to be used as septic tank. Second compartment, 500 gallons, to be used as lift compartment. <br /> ' Proposed tank; Xerxes�' Corporation RST II Fiberglass Septic Tank. Tank will be ordered without an <br /> outlet and with a compartment baffle. Inlet of the tank must have cast in place rubber fittings to create <br /> watertight seals. Top of risers shall be 3" above finished grade to avoid runoff from entering through <br /> , the top of riser. Septic tanks should be pumped at a minimum of every three years. <br /> • Septic/Lift Tank Risers — 24" diameter heavy corrugated PVC pipe. A watertight seal must be <br /> ' created between top of tank and the each riser. Top of riser should be 1"- 3" above finished grade. <br /> • Septic/Lift Tank Riser Cover — 24" diameter fiberglass cover with gasket, Orenco Systems, Inc. <br /> ' model # FL24G or equivalent. Lift tank riser cover should include insulation. Do not bury riser cover. <br /> , <br /> ' <br />