Laserfiche WebLink
►: � � <br /> The new supply line will need to go through the driveway. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shatl have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod fayer befow the entire mounded area must be tumed over, <br /> just break up the sod, be sure not to over work. <br /> All neighboring wells are tocated greater than 100' away from the proposed treatment <br /> area. <br /> Keep all heavy equipment off of the proposed treatment area before and after <br /> construction. The treatment area should be marked off before construction. This <br /> Design is not va{id & the system witl need to be relocated if fai{ure to protect the areas <br /> proposed for On-Site Sewage Treatment occurs. <br /> With proper installation and maintenance, this system should have no problem in <br /> treating septic effluent effectively. <br /> Nothing other than human waste, toitet tissue, laundry, showers, water softener etc. <br /> should be disposed of into the septic tanks. Iron filters must be diverted out of the <br /> system. Garbage disposals are not recommended, due to adding more solids & fine <br /> solids passing through to the system. Excessive amounts of soaps, anti-bacterial <br /> soaps, cleaning agents & chlorine agents may kill the bacteria needed to treat septic <br /> effluent. Additives are not recommended. Recommend to pump & clean your tanks <br /> through the manhote by a certified pumper every 2 years. Check with your pumper to <br /> set up a schedule. <br /> ��..� ���(_---- <br /> Steven B. Schirmers <br /> A� 4. <br /> 2 , <br /> �k <br />