Laserfiche WebLink
� � <br /> . i' • <br /> � � � Ci.t� o� ORONO <br /> • RESOLUTION OF THE CITY COUNCI L <br /> � NO. 2145 <br /> • - • • <br /> The fol lowing list of final submittals must be submitted to <br /> the Zoning Administrator two weeks prior to the regularly <br /> scheduled Council meeting on the second and fourth Mondays of the <br /> month: • <br /> l. RECORD PLAT drawings in the form of two (2) mylar copies <br /> and one (1 ) copy reduced to 1" = 200'. Drawing to include: <br /> a) Lot lines platted per preliminary survey by Coffin <br /> and Gronberg, Inc. dated 1-2-87, revised 2-17-87, <br /> revised 3-12-87. <br /> b) Dedication of "drainage and utility easements" 10' <br /> wide along all perimeter property lines and 5' each <br /> side of internal property lines. The new plat drawings <br /> must include the location of existing drainage and <br /> utility easements. <br /> • c) Designation and dedication of a dra•inage easement <br /> within Lot B on the plat drawings. <br /> 2. LEGAL DOCUMENTS required: <br /> a) Title Opinion addressed to the City. All owners, <br /> mortgage holders or others with property interest <br /> indicated therein shall sign the plat and all other <br /> documents affected by such interest. <br /> b) The applicant must provide certified copies of all <br /> recorded easements currently affecting the property. <br /> � c) Signed and executed drainage easement document for <br /> the drainage easement within Lot B. <br /> 3. FEES TO BE PAID: Tota 1 Due $3 5 0.0 0 <br /> a) Park dedication fee per current schedule: 1 new <br /> � residential lot at 2-acre desity = $200.00 <br /> b) Legal review and filing fees of $150.00 <br /> Adopted by the Orono City Council of the City of Orono, <br /> Min�iisota at a regular meeting held March 17, 1987. <br /> ATT ST: <br /> � � . • . <br /> �` othy M alli , City Clerk Jam R. Grabe , Mayor <br /> � Page 3 of 3 < , • <br />