Laserfiche WebLink
APPLYING FOR A PERMIT: <br /> If improvements to the buffer are required submit (in addition to the normal requirements for <br /> the permit): <br /> a. Three copies of the buffer improvement plan <br /> b. An additional copy of the survey <br /> c. The Flowage And Conservation Easement And Restrictive Covenant, signed by the <br /> property owners and mortgage company (if any). This will be recorded by the City <br /> after the permit is issued. The owners will be provided with a copy of the recorded <br /> document. <br /> d. The escrow agreement, signed by the property owners and the contractor, if the <br /> contractor is posting the escrow. The escrow is due when the building permit is <br /> issued. <br /> If no improvements are required to the buffer, (in addition to the normal requirements for the <br /> permit) submit the Flowage and Conservation Easement and Restrictive Covenant signed by <br /> the property owners and mortgage company (if any). This will be recorded by the City after <br /> the permit is issued. The owners will be provided with a copy of the recorded document. <br /> DURING CONSTRUCTION: <br /> Silt fence should be installed no closer to the wetland than the edge of the buffer. The buffer <br /> should not be disturbed unless it is part of the approved buffer improvement plan. A stop <br /> work order may be issued if there is unauthorized disturbance of the buffer. <br /> Buffer improvements must be inspected by the City's wetland consultant before the final <br /> Certificate of Occupancy is issued. This inspection must be scheduled through the Planning <br /> Assistant at 952-249-4620. Allow at least five working days. <br /> Thrs is an information sheet. Every effort has been made to insure the accuracy of the information contained herein; <br /> however, if any information rs not consistent with provisions of the Cify Code, the Code provisions will prevail. <br />