Laserfiche WebLink
STEPS FOR OBTAINING A BUILDING OR ZONING PERMIT <br /> ON PROPERTY WITH A WETLAND OR NEAR A WETLAND <br /> BEFORE APPLYING FOR THE PERMIT: <br /> 1. If you are uncertain if a wetland exists on or near the property, you may contact Planning <br /> staff at 952-249-4620 or planninq(a�ci.orono.mn.us or you may view map online at <br /> www.ci.orono.mn.us (click maps on left hand menu on home page) or at City offices (call <br /> 952-249-4600 for office hours). You can also find out the width of the buffer. <br /> 2. If there is a wetland, determine if your project meets the threshold for requiring a buffer. If <br /> your project doesn't meet the threshold but will possibly place buildings and structures <br /> within the buffer or buffer setback, contact Planning staff to determine if wetland <br /> delineation is required. If you project meets the threshold, you must obtain a wetland <br /> delineation. A wetland delineation must be done by certified wetland delineator. The City <br /> does not do delineations, nor does it recommend delineators. The Board of Water and <br /> Soil Resources (BWSR) maintains a list at their web site (http://www.bwsr.state.mn.us). <br /> Many Surveyors/Civil Engineering firms employ wetland delineators or have wetland <br /> delineators they work with. <br /> 3. Submit the wetland delineation to the Minnehaha Creek Watershed District (MCWD)for <br /> approval. The delineator can provide information on this process. <br /> 4. Have the approved delineation mapped onto a survey of the property along with the <br /> proposed construction. The surveyor should also provide metes and bounds legal <br /> descriptions of the wetland and the buffer as well as a digital CAD or GIS file in Hennepin <br /> County Coordinates. <br /> 5. Submit two copies each of the delineation report, the letter of acceptance from the <br /> MCWD, and the survey (with the legal descriptions and digital file) to Planning staff along <br /> with a "Request for Wetland Buffer Evaluation" form. Planning staff will have the City's <br /> wetland consultant review the delineation and make a site visit to evaluate the current <br /> condition of the buffer. You will be provided with a copy of the consultant's report and the <br /> Flowage and Conservation Easement and Restrictive Covenant. If improvements are <br /> required the report will indicate the amount of the escrow required to guarantee the <br /> improvements and their initial survival and the escrow agreement will be enclosed <br /> 6. If buffer improvements are required, prepare a plan for the improvements. See City Code <br /> Sections 78-1601 through 1614 for more information. <br /> AT THlS POINT YOU MAY APPLY FOR A BUILDING PERMIT OR ZONING PERMIT. <br /> PERMIT APPLICATIONS WILL NOT BE ACCEPTED BEFORE THIS POINT. <br /> This is an information sheet. Every effort has been made to insure the accuracy of the information contained herein; <br /> however, if any information is not consistent with provisions of the City Code, the Code provisions will prevail. <br />