My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-00636 - boathouse
Orono
>
Property Files
>
Street Address
>
C
>
Cherry Place
>
1410 Cherry Place - 08-117-23-33-0081
>
Permits/Inspections
>
2015-00636 - boathouse
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:45:27 PM
Creation date
4/6/2016 2:06:07 PM
Metadata
Fields
Template:
x Address Old
House Number
1410
Street Name
Cherry
Street Type
Place
Address
1410 Cherry Place
Document Type
Permits/Inspections
PIN
0811723330081
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christtine Mattson <br /> From: Adam Edwards <br /> Sent: Monday, June 01, 2015 12:35 PM <br /> To: Christine Mattson <br /> Subject: RE: 1410 Cherry Place/#2015-00636 <br /> Chris, <br /> I have reviewed the subject site plan and offer the following comments: <br /> � Top wall and bottom wall elevations, as required by the cities survey/site plan standards, are not provided for \ <br /> the retaining wall next to the lake (P). Walls over 4ft must be designed by a professional engineer. � <br /> C� Retaining wall (N) is shown to be 7.9 ft tall. It requires and engineered design. ,�� <br /> 3. Walls (J) and (K) are less than twice the height of the bottom wall (J) and are therefore considered one wall of I� <br /> 7.9 ft. The wall requires an engineered design. J �� <br /> Adam � <br /> From: Christine Mattson <br /> Sent: Friday, May 29, 2015 8:33 AM <br /> To: Adam Edwards <br /> Cc: Melanie Curtis <br /> Subject: 1410 Cherry Place/ #2015-00636 <br /> Ada m, <br /> A variance was approved for a replacement retaining wall within 75' of the OHWL. Attached is a copy of the resolution, <br /> which has not been signed yet and submitted surveys. The boat house is also proposed to be re-built in-kind. Please <br /> review and provide comments by June 5, 2015. <br /> Thank you! <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway ' Orono ! MN ' S5356 (physica/addressJ <br /> PO Box 66 I Crystal Bay '�,; MN ' 55323-0066 (mailing addressJ <br /> �' 952.249.4620 � 952.249.4616 <br /> � cmattson@ci.orono.mn.us ':: � www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 18 through Friday,August 28,2015) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Friday,July 3, 2015 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.