Laserfiche WebLink
Christine Mattson <br /> From: Christine Mattson <br /> Sent: Tuesday, May 07, 2013 8:58 AM <br /> To: 'toddholmers@gmail.com'; 'djohnson@deanjohnsonhomes.com' <br /> Subject: 3625 Cherry Ave-as-built/#2012-00270 <br /> Hello. <br /> City Engineer,Jesse Struve, has reviewed the as-built survey submitted and performed a site inspection. Struve's <br /> comments are included beiow. Before we can issue a final certificate of occupancy and/or refund the $10,000 TCO <br /> escrow,the issues listed below must be addressed. <br /> If you have any questions, please don't hesitate to contact us. <br /> From: Jesse Struve <br /> Sent: Monday, May 06, 2013 9:05 AM <br /> To: Melanie Curtis <br /> Cc: Christine Mattson <br /> Subject: 20130506 3625 Cherry Ave - as-built <br /> Metanie, <br /> I went out to review the as-built survey for 3925 Cherry Ave and have the following concerns: <br /> • The area does not have final grading complete or turf established. <br /> • The silt fence and erosion control need to be reestablished until turf is installed or established. This needs to be <br /> completed in the next 48 hrs. <br /> • The tiered walls on the east side of the house are greater than 4' and do not meet the separation requirements <br /> (2x the distance of the lower wall). Therefore the resident will need to have a registered professional engineer <br /> review the wall installation and sign off on how they were installed. <br /> • The driveway has changed drastically from what was approved and additional walls have been installed <br /> throughout the property. They should submit new,as-built hardcover calculations showing the updated <br /> numbers. <br /> Jesse Struve, PE <br /> Director of Pubfic Works/City Engineer <br /> City of Orono <br /> (952) 249-4661 - Direct <br /> (952) 249-4616- Fax <br /> www.ci.orono.mn.us <br /> 1 <br />