Laserfiche WebLink
Giertsen Companies <br /> January 19, 1998 <br /> Page Two <br /> 4. The City of Orono Building Inspectio��s Department is requiring construction consistent with <br /> current Code since this is a major repair. The fireplace was not constructed in accordance with <br /> the Code at the time of construction. <br /> 5. The following requirements were �uutually agreed upon: <br /> a. Full masonry construction with partitions between tlues in accordance with the Code. <br /> b. Support roof beam on steel column supported on solid masonry. <br /> c. Framing for first floor and mezzanine on independent beam behind firepiace with 1" air <br /> space. <br /> d. First floor framing beams to be changed to steel can be supported on solid masonry of <br /> fireplace due to its distance from the flue. <br /> e. The barbecue will be abandoned. <br /> Roof Frami��� <br /> 6. Roof framing was changed with two 1-3/4" x 16" microlams spanning full length from south <br /> exterior wall to north exterior wall and two interrnediate columns. <br /> FINAL INSPECTION <br /> 7. A final site visit was conducted by John H. Dahlmeier of J. H. Dahlmeier Ensineering Inc. on <br /> January 13, 1998. All construction is consistent with oribinal construction documents as <br /> moditied and noted herein. All work is satisfactory. <br /> 8. The City of Orono building framing inspection has been accomplished with no discrepancies. <br /> If you have any questions, please contact me. <br /> Sincerely, <br /> J.H.DAI�LMEIER ENGINEERING,INC. <br /> ,. <br /> F <br /> Jo ' � a�Imeier P.E. <br /> � <br /> JHD:Im <br /> Cc: Lyle Ohmann, City of Orono <br /> I hereby certify that this plan, specification or report was <br /> prepared by me or under my direct supervision and that I am a <br /> duly registered professional engineer under the laws of the State <br /> of Mirine ta. <br /> � <br /> Mi sota Regi tration No. 92]2 <br />