Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, February 22, 2016 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 4 of 13 <br /> <br />*4. SUPPORT FOR THREE RIVERS PARK DISTRICT GRANT REQUESTS – <br />RESOLUTION NO. 6587 and 6593 <br /> <br />Levang moved, Printup seconded, to adopt RESOLUTION NOS. 6587 and 6593, Resolutions of <br />Support for the Dakota Rail Regional Trail Hennepin County Bikeway Grant Request. VOTE: <br />Ayes 4, Nays 0. <br /> <br />*5. SEASONAL LOAD RESTRICTIONS – RESOLUTION NO. 6588 <br /> <br />Levang moved, Printup seconded, to adopt RESOLUTION NO. 6588, a Resolution Establishing <br />Seasonal Weight Restrictions on Orono Public City Streets. VOTE: Ayes 4, Nays 0. <br /> <br />*6. NORTHERN UTILITIES BUILDOUT ENGINEERING <br /> <br />Levang moved, Printup seconded, to approve an engineering proposal from Bolton & Menk in an <br />amount not to exceed $149,500 to commence upon the receipt of an escrow from Lake West, LLC, <br />in the amount of $47,369 for the design and engineering of the sewer and water main extensions <br />along CSAH112/Wayzata Boulevard. VOTE: Ayes 4, Nays 0. <br /> <br />*7. WATERTOWN ROAD PHASE 2 <br /> <br />Levang moved, Printup seconded, to authorize the solicitation of bids for Phase 2 of the Watertown <br />Road street project. VOTE: Ayes 4, Nays 0. <br /> <br />8. RE-ROOFING OF SALT SHED ROOF (2700 KELLEY PARKWAY) AND NAVARRE <br />WATER TREATMENT PLANT GARAGE ROOF (2345 BLAINE AVENUE) <br /> <br />Edwards stated there are two City structures that need re-roofing. Both buildings are experiencing shingle <br />failures due to curling shingles. The salt shed is a three-sided building located by Public Works where the <br />salt and sand is stored for winter maintenance. The treatment plant garage is located next to the water <br />treatment plant in Navarre. That facility is used to store equipment that is used in Navarre as well as the <br />portable backup generators for the lift station. <br /> <br />Edwards stated the current shingles on both buildings are past their life expectancy and need replacement. <br />Both are organic shingles which proved not to be a good idea since they do not hold up and tend to curl. <br /> <br />Edwards displayed a couple of the curling shingles to the Council. <br /> <br />Edwards stated quotes have been received from a number of roofers. The low quote was from GC <br />Builders for a total of $10,562. The City had originally scheduled in the CIP $10,000 for those roofs. In <br />the CIP, the Navarre garage is a combination of roofing and painting but quotes have not been received <br />for the painting. <br /> <br />Walsh noted one more bid was received today and that there were a total of four bids. <br /> <br />Edwards stated when he reached out to Council Member Walsh, it was his understanding that he wanted <br />to check the condition of the roofs and confirm whether they needed to be replaced. <br />