Laserfiche WebLink
_ _---— <br /> s � <br /> Builder Acknowledgement Form <br /> 2750 Casco Point Road /#2016-00069 <br /> Builder ' <br /> Permit Conditions Initials ' <br /> - st 'tte I'' <br /> �ri�r t�the start�f framin�, � f�un�ati�n as �uilt survcy mu be submi d � ' <br /> and approved by the City or a stop work order will be issued. <br /> Schedule a minimum of one hour for the framing inspection. � <br /> � <br /> I <br /> Erosion control mechanisms must be installed and inspected by the City ; <br /> properto any land disturbing activities. The contractor must provide a ' <br /> minimum of a 24 hour notice prior to inspection. � � i <br /> i <br /> Erosion control shall be installed and maintained throughout the entire � <br /> project and must remain until vegetation has been established. <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and � <br /> hardcover calculations, if applicable must be submitted and approved. <br /> In the event of winter or other unfavorable weather conditions (which <br /> prevent the completion of the exterior improvements and/or as-built � <br /> survey) a Temporary Certificate of Occupancy (TCO) may be necessary. A <br /> TCO requires a $10,000 escrow. <br /> Advisory Comments <br /> Any changes to the exterior/landscaping improvements, i.e. patios, grading, <br /> sidewalks, retaining walls, etc. not currently shown on�the approved survey `� <br /> and landscaping plan will require a separate Zoning Permit application to be <br /> submitted and approved prior to the work commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not <br /> separated by twice of the height of the lower wall require engineered plans ��� <br /> and a building permit to be submitted and approved rp ior to construction. <br /> `y <br /> � <br /> 7 <br /> L� j.✓�� <br /> '� -� <br /> �-�9�� <br /> W:\Street Files\Casco Pt Rd\2750\Builder Acknowledgement Form 2016-00069.docx <br />