Laserfiche WebLink
r <br /> �.: _ <br /> • <br /> ` C�t� o� ORONO , � <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 1616 <br /> • <br /> • � • • , . <br /> Applicable <br /> . Fee Code Section <br /> PAGE 8. CONSTRUCTION PERMITS & INSPECTION <br /> . FEES (CONT) <br /> Permit Type • <br /> MUNICIPAL CONNECTION PERMIT <br /> Sewer $30 .00 25. 321 <br /> Water $30 .00 . 25A.020 <br /> 5/8" meter $95.00 . 25A. 310 <br /> 3/4" meter $130 .00 25A. 310 <br /> larger meter quote basis 25A.310 <br /> Mail-in postage_ & Handling charge/ <br /> (sewer, water permits only) $1. 00 . <br /> ON-SITE SYSTEMS 22. 300 (Ord. 210) <br /> � ` Design" Review Fees ' Included with permit fees <br /> Subdivision Site Evaluation Report <br /> review � $ 30 .00/per new lot <br /> Residential System Permit . � $ 75.00+$15 per inspec. over 2 <br /> . (new or total replacement) <br /> Non-Residential System Permit $100 .00+$20 per inspec. over 4 <br /> (new or total replacement) <br /> . Non-Residential System - Partial <br /> replacement ' � $ 60 .00+$20 per inspec. over 2 <br /> ' Existing System Repairs/Drainfield � � <br /> addition (but not complete replace. ) $ 30 .00 � <br /> Annual Service Charge $ 20 .00/system/year + 10� late <br /> , �penalty �or unpaid charges <br /> , <br /> � � ' certified <br /> INDIVIDUAL WELLS � . 23 .050 (Ord. 221) <br /> � Installation Permit . $ �30 .00 <br /> � GRADING, EXCAVATION, FILLING � 31. 705, 31. 871 <br /> Design Review Fees (Staff .only) _ ' Included in permit <br /> 50 cubic yards or less (5 loads) . � $100 .00 (staff permit) <br /> 51-100 cubic yards � (max. ].0 lo�ads) • $150.00 (staff permit) <br /> 101 cubic yards or more ' '� $200 .00 + Cond. Use Permit <br /> � NOTE: 101 cibic yards or more requires- a Conditional Use Permit unless <br /> approved as part of a building permit. <br /> l � <br /> - -3- <br />